Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 285
Message text: The calculated revenues are too high
The calculated revenue is the result of the following formula:
Cumulative actual costs / Planned costs of valuation * Planned revenue
of valuation
The result of this formula exceeds the maximum permitted size of the
currency fields.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the planned costs and the planned revenues of the object to be
processed. The ratio of the planned revenue to the planned costs may be
too high.
Error message extract from SAP system. Copyright SAP SE.
KJ285
- The calculated revenues are too high ?The SAP error message KJ285, which states "The calculated revenues are too high," typically occurs in the context of revenue recognition in SAP, particularly when dealing with projects or sales orders. This error indicates that the system has detected that the revenue calculated for a particular transaction exceeds the allowable limits or expectations based on the configuration or the data entered. Causes: Incorrect Revenue Recognition Method: The revenue recognition method configured for the project or sales order may not align with the actual revenue being recognized. Data Entry Errors: There may be incorrect or inconsistent data entered in the sales order, project, or related documents that lead to inflated revenue calculations. Over-allocated Costs: If costs are over-allocated or not properly accounted for, it can lead to an imbalance in revenue calculations.
Configuration Issues: The settings in the revenue recognition configuration may not be set up correctly, leading to unrealistic revenue calculations. Contractual Limitations: There may be
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ284
The calculated costs are too high
What causes this issue? The calculated costs are the result of the formula: Cumulative actual revenue / planned revenue of valuation * planned costs ...
KJ283
& log entries deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KJ286
The profit percentage is too high
What causes this issue? The profit percentage is the result of the following formula: (Planned revenue - Planned costs) * 100 / Planned costs The res...
KJ287
The calculated costs are too high
What causes this issue? The calculated costs are the result of the following formula: Planned costs * Actual qty / Planned qty The result of this for...
Click on this link to search all SAP messages.