Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 173
Message text: Do not use valuation basis &1 with profit basis &2
A valuation basis which uses current costs can only be used with profit
basis <ZH>C</>.
In the valuation method, use either a different valuation basis or a
different profit basis.
Note that a valuation basis which uses current costs can only be used
in results analysis for WBS elements.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KJ173
- Do not use valuation basis &1 with profit basis &2 ?The SAP error message KJ173, which states "Do not use valuation basis &1 with profit basis &2," typically occurs in the context of controlling (CO) and profitability analysis (CO-PA) when there is a mismatch between the valuation basis and the profit basis in your configuration.
Cause:
This error arises when the system detects that the combination of the valuation basis and profit basis being used is not valid. Each valuation basis in SAP CO-PA is designed to work with specific profit bases, and using an incompatible combination can lead to inconsistencies in financial reporting and analysis.
Solution:
To resolve this error, you can take the following steps:
Check Configuration:
- Go to the configuration settings in SAP for CO-PA.
- Verify the settings for valuation basis and profit basis. Ensure that the combination you are trying to use is valid according to your configuration.
Review Master Data:
- Check the master data for the characteristics involved. Ensure that the valuation basis and profit basis are correctly assigned to the relevant characteristics.
Adjust Settings:
- If you find that the combination is indeed invalid, you may need to adjust your settings. This could involve changing the profit basis or the valuation basis to a compatible one.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on which valuation bases are compatible with which profit bases.
Testing:
- After making changes, perform tests to ensure that the error no longer occurs and that the system behaves as expected.
Seek Help:
- If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.
Related Information:
KE4S
(for CO-PA planning) or KE30
(for CO-PA reports) to analyze the data and settings.By following these steps, you should be able to identify the cause of the KJ173 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KJ172
Use valuation basis &1 only for WBS elements
What causes this issue? A valuation basis which uses current costs can only be used with WBS elements.System Response The system issues an error mes...
KJ171
Item &1: Enter the time-based parameters in the billing plan
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KJ174
Version &1 is not intended for updated costs. Please change
What causes this issue? The version you entered for the updated costs in the valuation method in Customizing for results analysis cannot be used for ...
KJ175
Do not use valuation basis &1 with simulation "actual with plan"
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.