How To Fix KJ135 - Run schedule header is assigned to sales order or project


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KJ - Cost Object Controlling for Make-to-Order Production

  • Message number: 135

  • Message text: Run schedule header is assigned to sales order or project

  • Show details Hide details
  • What causes this issue?

    The work in process for this run schedule header is calculated in
    <DS:GLOS.results_analysis>results analysis</> for the sales order or
    project.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KJ135 - Run schedule header is assigned to sales order or project ?

    The SAP error message KJ135 indicates that a run schedule header (RSH) is assigned to a sales order or project, which prevents certain operations from being performed. This error typically arises in the context of production planning and control, particularly when dealing with run schedules in the context of production orders or sales orders.

    Cause:

    The error occurs when:

    • A run schedule header is linked to a sales order or project, and the system does not allow certain actions (like deletion or modification) on that RSH because it is tied to a specific sales order or project.
    • The RSH is being processed in a way that conflicts with its current assignment.

    Solution:

    To resolve the KJ135 error, you can take the following steps:

    1. Check Assignment: Verify the assignment of the run schedule header to the sales order or project. You can do this by navigating to the relevant transaction in SAP (e.g., COHV, CO02) and checking the details of the RSH.

    2. Unassign or Change Assignment: If the RSH needs to be modified or deleted, you may need to unassign it from the sales order or project. This can typically be done in the production order or sales order management screens.

    3. Review Dependencies: Ensure that there are no dependencies or processes that are currently using the RSH. If there are, you may need to complete or cancel those processes before making changes.

    4. Consult Documentation: Refer to SAP documentation or help files for specific instructions related to your version of SAP, as the steps may vary slightly depending on the configuration and version.

    5. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as COHV (Mass Processing of Production Orders), CO02 (Change Production Order), and others that may be relevant to your situation.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles and Permissions: Ensure that you have the necessary permissions to make changes to run schedule headers and associated orders.

    By following these steps, you should be able to identify the cause of the KJ135 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker