Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 135
Message text: Run schedule header is assigned to sales order or project
The work in process for this run schedule header is calculated in
<DS:GLOS.results_analysis>results analysis</> for the sales order or
project.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KJ135
- Run schedule header is assigned to sales order or project ?The SAP error message KJ135 indicates that a run schedule header (RSH) is assigned to a sales order or project, which prevents certain operations from being performed. This error typically arises in the context of production planning and control, particularly when dealing with run schedules in the context of production orders or sales orders.
Cause: The error occurs when: A run schedule header is linked to a sales order or project, and the system does not allow certain actions (like deletion or modification) on that RSH because it is tied to a specific sales order or project. The RSH is being processed in a way that conflicts with its current assignment.
Solution: To resolve the KJ135 error, you can take the following steps: Check Assignment: Verify the assignment of the run schedule header to the sales order or project. You can do this by navigating to the relevant transaction in SAP (e.g., COHV, CO02) and checking the
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ134
Material &: active cost estimate has no cost element plan
What causes this issue? You are calculating work in process using the confirmed yield and the planned costs for the operations carried out up to now....
KJ133
Run schedule header with multiple positions cannot be processed
What causes this issue? Run schedule headers with more than one item cannot be processed.System Response The function is not executed.How to fix thi...
KJ136
This item has a separate cost collector
What causes this issue? The run schedule header item can carry costs. <DS:GLOS.WIP_calculation>WIP calculation</> for run schedule header...
KJ137
No item -> valuation type undefined
What causes this issue? No item exists for the run schedule header.System Response <DS:GLOS.WIP_calculation>WIP calculation</> is not po...
Click on this link to search all SAP messages.