Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 134
Message text: Material &: active cost estimate has no cost element plan
You are calculating work in process using the confirmed yield and the
planned costs for the operations carried out up to now. The planned
costs for the operations are calculated using the information in the
<DS:GLOS.standard_cost_estimate>standard cost estimate</> that was used
to calculate the current standard price.
This information can only be used to calculate the work in process if
the results of the cost estimate were saved as a cost element
itemization (that is, split according to cost element).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Go to the costing view of the material master record of material &V1&,
select <LS>Extras -> Costing details</> and see which cost estimate was
used to calculate the standard price in this period.
Call up this cost estimate and see if the costing results were saved as
a cost element itemization.
If you release the cost estimate, its results are written to the
material master record as the standard price. You can only release a
standard cost estimate once in a given period.
Error message extract from SAP system. Copyright SAP SE.
KJ134
- Material &: active cost estimate has no cost element plan ?The SAP error message KJ134, which states "Material &: active cost estimate has no cost element plan," typically occurs in the context of cost accounting and controlling within SAP. This error indicates that the system is unable to find a cost element plan for the specified material in the active cost estimate. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Missing Cost Element Plan: The primary reason for this error is that there is no cost element plan defined for the material in question. Cost elements are necessary for the system to allocate costs correctly.
- Inactive Cost Estimate: The cost estimate may not be active or may not have been released properly.
- Configuration Issues: There may be issues with the configuration of the controlling area or the cost element itself.
- Material Master Data: The material master data may not be set up correctly, leading to the absence of a cost element plan.
Solutions:
Check Cost Element Plan:
- Navigate to the cost element planning transaction (e.g., KP06) and verify if a cost element plan exists for the relevant controlling area and period.
- If it does not exist, create a cost element plan for the material.
Review Cost Estimate:
- Ensure that the cost estimate for the material is active. You can check this in the cost estimate display transaction (e.g., CK13N).
- If the cost estimate is not active, you may need to release it or create a new one.
Material Master Data:
- Check the material master data (transaction MM03) to ensure that all relevant views (especially costing views) are properly maintained.
- Ensure that the material is assigned to the correct valuation class and that the costing data is complete.
Configuration Check:
- Review the configuration settings in the controlling area to ensure that cost elements are properly defined and linked to the relevant cost centers or internal orders.
- Ensure that the cost element categories are correctly set up.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on cost element planning and cost estimates.
SAP Notes:
- Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Controlling (CO) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KJ133
Run schedule header with multiple positions cannot be processed
What causes this issue? Run schedule headers with more than one item cannot be processed.System Response The function is not executed.How to fix thi...
KJ132
Object not converted: No editing in company code currency
What causes this issue? There are no objects in the company code currency.System Response <DS:GLOS.WIP_calculation>WIP calculation</> or...
KJ135
Run schedule header is assigned to sales order or project
What causes this issue? The work in process for this run schedule header is calculated in <DS:GLOS.results_analysis>results analysis</> f...
KJ136
This item has a separate cost collector
What causes this issue? The run schedule header item can carry costs. <DS:GLOS.WIP_calculation>WIP calculation</> for run schedule header...