Do you have any question about this error?
Message type: E = Error
Message class: KI -
Message number: 711
Message text: Variable activity reference for 0 activity.
For object &V1&, you planned a variable activity reference of &V2&.
However, in periods &V3&, activity for &V1& is 0. This would result in
an iteration error due to division by zero.
The variable reference is set to fixed, and the billing is executed.
Check the planning for object &V1&.
Error message extract from SAP system. Copyright SAP SE.
KI711
- Variable activity reference for 0 activity. ?The SAP error message KI711 ("Variable activity reference for 0 activity") typically occurs in the context of controlling (CO) when you are trying to post or process data related to activity types or cost centers, and the system cannot find a valid activity reference. This can happen for several reasons, including configuration issues or data inconsistencies.
Causes:
- Missing Activity Type: The activity type you are trying to reference may not be defined in the system.
- Incorrect Configuration: The configuration for the controlling area, cost center, or activity type may not be set up correctly.
- Zero Activity: The system is trying to reference an activity that has a value of zero, which is not valid.
- Data Inconsistencies: There may be inconsistencies in the master data or transaction data that lead to this error.
- Period Closure: The period in which you are trying to post may be closed, preventing any new postings.
Solutions:
Check Activity Type Configuration:
- Go to the configuration settings for activity types in the controlling area and ensure that the activity type is defined and active.
- Use transaction code
OKA0
to check the activity types.Verify Cost Center Settings:
- Ensure that the cost center you are using is correctly assigned to the appropriate activity type.
- Use transaction code
KS01
to check the cost center master data.Review Posting Data:
- Check the data you are trying to post to ensure that it does not reference a zero activity.
- Ensure that the values being posted are valid and correspond to the defined activity types.
Check for Period Closure:
- Verify if the period you are trying to post to is open. If it is closed, you may need to open it or post to a different period.
- Use transaction code
OB52
to check the period status.Consult SAP Notes:
- Look for any relevant SAP Notes that may address this specific error. Sometimes, there are known issues or patches that can resolve the problem.
Debugging:
- If you have access to debugging tools, you can analyze the program or transaction that is generating the error to identify the root cause.
Related Information:
OKA0
: Activity Type ConfigurationKS01
: Create Cost CenterOB52
: Open/Close Posting PeriodsIf the problem persists after checking these areas, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP CO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KI710
Field overrun in costs for &1 , cost element &2 .
What causes this issue? For cost center/activity type &V1&, the revaluation of primary costs resulted in a field overrun for cost element &am...
KI709
Field overrun in activity for &1 and &2 .
What causes this issue? Revaluation of activity from &V1& to &V2& resulted in a field overflow. The allocatable quantity was determin...
KI712
No activity types requiring reconciliation are planned.
What causes this issue? No activity quantities were planned in controlling area &V1&, fiscal year &V2&, version &V3&, which c...
KI713
No target-to-actual activity types are provided for.
What causes this issue? No activity types are planned in controlling area &V1&, fiscal year &V2&, which can be allocated via target=a...