Message type: E = Error
Message class: KI -
Message number: 709
Message text: Field overrun in activity for &1 and &2 .
Revaluation of activity from &V1& to &V2& resulted in a field overflow.
The allocatable quantity was determined to be &V3& wtih fixed portion
of &V4&. The overflow occurs if these quantities are multiplied by the
activity price from &V1&.
Plan costs are not changed. Quantities and values for this activity
relationship do not match any longer.
Check the activity network and remove the cause of the large activity
flow from &V1& to &V2&.
Repeat plan reconciliation.
Error message extract from SAP system. Copyright SAP SE.
KI709
- Field overrun in activity for &1 and &2 . ?The SAP error message KI709, which states "Field overrun in activity for &1 and &2," typically occurs in the context of controlling (CO) when there is an issue with the data being processed in the activity allocation or assessment. This error indicates that the data being inputted exceeds the defined field length for the activity allocation.
Cause: Field Length Exceeded: The most common cause of this error is that the data being processed (such as activity quantities or amounts) exceeds the maximum length defined for the respective fields in the database or the program. Incorrect Data Entry: If the data entered into the system is not formatted correctly or is too large, it can lead to this error.
Configuration Issues: There may be issues with the configuration of the controlling area or the activity types that are causing the data to be processed incorrectly.
Solution: Check Data Length: Review the data being entered for activity allocation.
Get instant SAP help. Sign up for our Free Essentials Plan.
KI708
No activity price found for &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KI707
No revaluation of costs possible for &1 .
What causes this issue? Plan activity for cost center/activity type &V1& was zero before plan reconciliation. The reconciliation calculated p...
KI710
Field overrun in costs for &1 , cost element &2 .
What causes this issue? For cost center/activity type &V1&, the revaluation of primary costs resulted in a field overrun for cost element &am...
KI711
Variable activity reference for 0 activity.
What causes this issue? For object &V1&, you planned a variable activity reference of &V2&. However, in periods &V3&, activit...
Click on this link to search all SAP messages.