Message type: E = Error
Message class: KI -
Message number: 710
Message text: Field overrun in costs for &1 , cost element &2 .
For cost center/activity type &V1&, the revaluation of primary costs
resulted in a field overrun for cost element &V2&. Plan activity before
plan reconciliation was &V3&, and was calculated to be &V4& by the
reconciliation.
Primary costs for the activity type must be revaluated using the
following relationship:
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
(New plan activity) / (Old plan activity)Check the activity network and remove the cause for the relationship:
(New plan activity) / (Old plan activity)
Passen Sie die Plankosten auf der Kostenstelle/Leistungsart &V1&
manuell an.
Error message extract from SAP system. Copyright SAP SE.
KI710
- Field overrun in costs for &1 , cost element &2 . ?The SAP error message KI710, which states "Field overrun in costs for &1, cost element &2," typically occurs in the context of controlling (CO) when there is an issue with the data being processed in the system. This error indicates that the system is trying to process a cost entry that exceeds the defined field length for the cost element specified.
Cause:
- Data Length Exceeded: The primary cause of this error is that the amount being posted to a cost element exceeds the maximum allowable length for that field in the database. This can happen if the cost amount is too large or if there are too many decimal places.
- Incorrect Configuration: Sometimes, the configuration of the cost element or the associated cost center may not align with the expected data formats.
- Data Entry Errors: Manual data entry errors can also lead to this issue, especially if large amounts are entered incorrectly.
Solution:
- Check Amounts: Review the amounts being posted to the cost element. Ensure that they are within the acceptable range and do not exceed the maximum field length.
- Adjust Decimal Places: If the issue is related to decimal places, consider adjusting the number of decimal places in the configuration settings for the cost element.
- Review Configuration: Check the configuration of the cost element and related settings in the controlling module. Ensure that they are set up correctly and that the field lengths are appropriate for the data being processed.
- Data Validation: Implement validation checks in your data entry processes to prevent large or incorrect amounts from being entered.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific guidelines related to the cost element and its configuration.
Related Information:
KSB1
(Cost Centers: Actual Line Items) or KOB1
(Order: Actual Line Items) to analyze the entries related to the cost element.If the problem persists after following these steps, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP CO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KI709
Field overrun in activity for &1 and &2 .
What causes this issue? Revaluation of activity from &V1& to &V2& resulted in a field overflow. The allocatable quantity was determin...
KI708
No activity price found for &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KI711
Variable activity reference for 0 activity.
What causes this issue? For object &V1&, you planned a variable activity reference of &V2&. However, in periods &V3&, activit...
KI712
No activity types requiring reconciliation are planned.
What causes this issue? No activity quantities were planned in controlling area &V1&, fiscal year &V2&, version &V3&, which c...
Click on this link to search all SAP messages.