How To Fix KG1025 - Planning level &1 has been created


KG1025 - Overview

  • Message type: E = Error

  • Message class: KG1 - CO-PA planning

  • Message number: 025

  • Message text: Planning level &1 has been created

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KG1025 - Planning level &1 has been created ?
    The SAP error message KG1025, which states "Planning level &1 has been created," typically occurs in the context of SAP Controlling (CO) when working with planning levels in the Profitability Analysis (CO-PA) module or other planning-related transactions. This message indicates that a planning level has been created, but it may also imply that there is an issue or a need for further action related to that planning level.
    
    Cause: Planning Level Creation: The message is triggered when a new planning level is created in the system. This can happen during the execution of planning transactions or when setting up planning scenarios. Inconsistent Data: The planning level may not be properly configured or may have inconsistent data that needs to be addressed. Authorization Issues: Sometimes, the user may not have the necessary authorizations to work with the newly created planning level.
    Solution: Check Planning Level Configuration: Navigate to the configuration settings for planning levels in SAP. Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author