How To Fix KG038 - When planning by profit center, enter controlling area


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KG - CO-PA Planning

  • Message number: 038

  • Message text: When planning by profit center, enter controlling area

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KG038 - When planning by profit center, enter controlling area ?

    The SAP error message KG038 typically occurs in the context of planning activities within the Controlling (CO) module, specifically when working with profit centers. This error indicates that the system requires a controlling area to be specified when planning by profit center.

    Cause of Error KG038:

    The error message KG038 is triggered when:

    • You are trying to execute a planning transaction that requires a controlling area, but it has not been specified in the selection criteria.
    • The system needs to know which controlling area the profit center belongs to in order to process the planning data correctly.

    Solution:

    To resolve the KG038 error, you can follow these steps:

    1. Specify the Controlling Area:

      • When you are in the planning transaction (e.g., using transaction codes like KP06, KP07, or KP10), ensure that you enter the controlling area in the selection screen.
      • The controlling area is a key organizational unit in SAP that represents a closed system for cost accounting.
    2. Check Master Data:

      • Ensure that the profit center you are trying to plan for is assigned to a controlling area. You can check this in the master data settings for the profit center.
      • Use transaction code KE52 to view or edit the profit center master data and verify its assignment to the correct controlling area.
    3. Review Planning Layout:

      • If you are using a specific planning layout, ensure that the layout is configured to include the controlling area as a required field.
    4. User Authorization:

      • Ensure that you have the necessary authorizations to access the controlling area and perform planning activities.
    5. Consult Documentation:

      • If you are unsure about the controlling area or how to set it up, refer to the SAP documentation or consult with your SAP CO module expert.

    Related Information:

    • Controlling Area: A controlling area is an organizational unit in SAP that is used for cost accounting. It can contain one or more company codes and is essential for planning and reporting in the CO module.
    • Profit Center: A profit center is a sub-unit of an organization that is responsible for generating revenue and incurring costs. It is used for internal reporting and performance evaluation.
    • Planning Transactions: Common planning transactions in SAP CO include KP06 (Cost Center Planning), KP07 (Cost Center Planning - Manual), and KP10 (Cost Center Planning - Distribution).

    By ensuring that the controlling area is specified and correctly configured, you should be able to resolve the KG038 error and proceed with your planning activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author