Do you have any question about this error?
Message type: E = Error
Message class: KBP - Log Messages EC-BP
Message number: 033
Message text: &1 data records generated by planning run. Planning run ended (test run)
This was a test run. No data records were updated.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you wish to permanently save the data records created temporarily in
the test run, switch off the 'Test run' indicator in the 'Extras'
section.
Error message extract from SAP system. Copyright SAP SE.
KBP033
- &1 data records generated by planning run. Planning run ended (test run) ?The SAP error message KBP033 indicates that a planning run has generated a certain number of data records, but it has ended as a test run. This message typically occurs in the context of SAP's Controlling (CO) module, particularly in the area of Profitability Analysis (CO-PA) or other planning-related activities.
Cause:
- Test Run Configuration: The planning run was executed in test mode, which means that no actual changes were made to the database. This is often done to verify the results of the planning run without affecting live data.
- Data Records Generated: The message indicates that data records were generated during the planning run, but since it was a test run, these records are not saved or posted to the database.
- Planning Parameters: There may be specific parameters or settings in the planning run that are causing it to generate data records, but not commit them due to the test run setting.
Solution:
- Execute in Production Mode: If you want the changes to be saved, you need to execute the planning run in production mode instead of test mode. This usually involves changing a parameter in the planning run configuration.
- Review Planning Settings: Check the settings and parameters used in the planning run to ensure they are configured correctly for your intended outcome.
- Analyze Generated Data: If you need to review the data generated during the test run, you can analyze it in the planning application or reporting tools to understand the impact of the planned changes.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the planning run you are executing, as different planning applications may have unique configurations.
Related Information:
KP06
(Cost Center Planning), KPF6
(Profitability Analysis Planning), or others depending on your specific planning context.If you continue to experience issues or need further assistance, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored guidance based on your specific system configuration and business processes.
Get instant SAP help. Start your 7-day free trial now.
KBP032
No data available to distribute. Planning run ended without any action
What causes this issue? No data is available for distribution. The planning run was ended without any action. No data was found by the selection in t...
KBP031
&1 data records imported from the target area
What causes this issue? Data records were imported from the target area. For top-down distribution, data records must exist in the target area, other...
KBP034
Planning run ended without any action - data slice error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KBP035
Error occurred when data transfer was being initialized
What causes this issue? Error when transferring data. The sender structure could not be initialized. Update of the plan data was terminated.System Re...
Click on this link to search all SAP messages.