Do you have any question about this error?
Message type: E = Error
Message class: KA - CO Overhead Costs: Overhead, Accrual Calculation
Message number: 254
Message text: No overhead structure has been assigned in controlling area &
The desired processign cannot be carried out because no valid costing
sheet is assigned to controlling area &V1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the controlling area. If it is correct, check the surcharge
costing sheet assignment in the assignment of the surcharge costing
sheet for this controlling area in imputed cost maintenance.
Error message extract from SAP system. Copyright SAP SE.
KA254
- No overhead structure has been assigned in controlling area & ?The SAP error message KA254 ("No overhead structure has been assigned in controlling area") typically occurs in the context of controlling (CO) when you are trying to perform activities related to overhead costing, such as creating or processing cost centers, internal orders, or other controlling objects. This error indicates that the system cannot find an overhead structure assigned to the specified controlling area.
Cause:
The primary cause of this error is that the controlling area you are working with does not have an overhead structure defined. Overhead structures are necessary for the system to determine how overhead costs should be allocated to cost objects.
Solution:
To resolve this error, you need to assign an overhead structure to the controlling area. Here are the steps to do this:
Access the Configuration:
- Go to the SAP Easy Access screen.
- Navigate to the following path:
SPRO -> SAP Reference IMG -> Controlling -> Overhead Cost Controlling -> Cost Center Accounting -> Master Data -> Define Overhead Structure
Define Overhead Structure:
- In the configuration screen, you can define a new overhead structure or modify an existing one.
- Ensure that the overhead structure is properly configured with the necessary parameters.
Assign Overhead Structure to Controlling Area:
- After defining the overhead structure, you need to assign it to the relevant controlling area.
- Navigate to:
SPRO -> SAP Reference IMG -> Controlling -> Overhead Cost Controlling -> Cost Center Accounting -> Master Data -> Assign Overhead Structure to Controlling Area
- Select the controlling area and assign the overhead structure you defined.
Check for Other Configurations:
- Ensure that all other related configurations are correctly set up, such as cost center types, cost element categories, and any other relevant settings.
Test the Configuration:
- After making the changes, try to perform the action that previously resulted in the error to confirm that the issue has been resolved.
Related Information:
OKB9
(to define overhead structures) and OKB2
(to assign overhead structures) for quicker access.If the problem persists after following these steps, it may be beneficial to consult with your SAP Basis or CO module consultant for further investigation.
Get instant SAP help. Start your 7-day free trial now.
KA253
Enter the costing sheet
What causes this issue? You have omitted to specify which costing sheet you want to process.System Response The system cannot process your request.H...
KA252
All costing sheets have been assigned
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KA255
The system cannot determine a unique costing sheet
What causes this issue? No single costing sheet is defined for the processing period. At least two different costing sheets were assigned.System Resp...
KA256
Error while deleting entry & in table &
What causes this issue? An error occurred during the update of the processed table entries after entries were deleted.System Response The system iss...
Click on this link to search all SAP messages.