How To Fix K6625 - The planning period is temporally before the reference period.


K6625 - Overview

  • Message type: E = Error

  • Message class: K6 - EC-EIS/EC-BP data basis: Data entry and collection

  • Message number: 625

  • Message text: The planning period is temporally before the reference period.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message K6625 - The planning period is temporally before the reference period. ?
    The SAP error message K6625, "The planning period is temporally before the reference period," typically occurs in the context of planning and budgeting within SAP's Controlling (CO) module, particularly when working with cost center planning or profit center planning.
    
    Cause: This error arises when you attempt to enter or modify planning data for a period that is earlier than the reference period defined in the system. The reference period is usually the period from which the system expects to start planning, and it is often set based on the fiscal year or the current planning cycle.
    Solution: To resolve this error, you can take the following steps: Check the Planning Period: Ensure that the planning period you are trying to enter is correct and is not set to a date that is earlier than the reference period. Adjust the Reference Period: If necessary, you can adjust the reference period in the planning settings. This may involve

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant