Message type: E = Error
Message class: K3 - Material Cost Estimate
Message number: 026
Message text: Material & in plant & can only be costed with quantity structure
The <DS:DE.CK_EKALREL>With quantity structure</> indicator is set in
the material master costing view of material &V1& in plant &V2&.
If applicable, change the <LS>With quantity structure</> indicator for
material &V1& in plant &V2&.
<DS:TRAN.MM02>Change material master</>
Error message extract from SAP system. Copyright SAP SE.
K3026
- Material & in plant & can only be costed with quantity structure ?The SAP error message K3026 ("Material & in plant & can only be costed with quantity structure") typically occurs in the context of cost planning and controlling when you are trying to perform a cost estimate for a material that is set up in a way that requires a quantity structure for costing. This usually means that the material is configured to use a bill of materials (BOM) and routing, which are necessary for calculating costs based on the components and processes involved in production.
Cause: Material Configuration: The material in question is likely configured as a "costing with quantity structure" material. This means it requires a BOM and routing to determine its costs. Missing BOM or Routing: If the BOM or routing is not maintained for the material, the system cannot perform the costing as required. Costing Variant Settings: The costing variant being used may not be set up to handle materials that
Get instant SAP help. Sign up for our Free Essentials Plan.
K3025
Material cannot be costed
What causes this issue? This material cannot be costed, according to the material type or the costing view in the material master.How to fix this err...
K3024
Cost estimate for material & does not exist
What causes this issue? You have not yet created a cost estimate for material &V1&.How to fix this error? Create a cost estimate for materia...
K3027
Cost estimate for material & has already been marked for release
What causes this issue? If a cost estimate is marked for release, the total value calculated by the cost estimate is transferred to the material mast...
K3028
Material master for cost estimate is incorrectly maintained
What causes this issue? You cannot create a <DS:GLOS.cost_estimate_without_quantity_structure>cost estimate without quantity structure</>...
Click on this link to search all SAP messages.