Do you have any question about this error?
Message type: E = Error
Message class: K3 - Material Cost Estimate
Message number: 026
Message text: Material & in plant & can only be costed with quantity structure
The <DS:DE.CK_EKALREL>With quantity structure</> indicator is set in
the material master costing view of material &V1& in plant &V2&.
If applicable, change the <LS>With quantity structure</> indicator for
material &V1& in plant &V2&.
<DS:TRAN.MM02>Change material master</>
Error message extract from SAP system. Copyright SAP SE.
K3026
- Material & in plant & can only be costed with quantity structure ?The SAP error message K3026 ("Material & in plant & can only be costed with quantity structure") typically occurs in the context of cost planning and controlling when you are trying to perform a cost estimate for a material that is set up in a way that requires a quantity structure for costing. This usually means that the material is configured to use a bill of materials (BOM) and routing, which are necessary for calculating costs based on the components and processes involved in production.
Cause:
- Material Configuration: The material in question is likely configured as a "costing with quantity structure" material. This means it requires a BOM and routing to determine its costs.
- Missing BOM or Routing: If the BOM or routing is not maintained for the material, the system cannot perform the costing as required.
- Costing Variant Settings: The costing variant being used may not be set up to handle materials that require a quantity structure.
Solution:
Check BOM and Routing:
- Ensure that a valid BOM is created for the material in the specified plant.
- Ensure that a valid routing is also created for the material.
- You can check this in the SAP system using transaction codes like
CS03
(Display BOM) andCA03
(Display Routing).Costing Variant Configuration:
- Verify that the costing variant you are using is configured to allow for costing with quantity structure. You can check this in the configuration settings for costing variants (transaction code
OKKN
).Cost Estimate:
- Once the BOM and routing are in place, you can attempt to re-run the cost estimate for the material using transaction code
CK11N
(Create Cost Estimate with Quantity Structure).Material Master Settings:
- Check the material master data to ensure that the costing type is set correctly. You can do this using transaction code
MM03
(Display Material).Consult Documentation:
- If you are unsure about the configuration or the steps, refer to SAP documentation or consult with your SAP support team for guidance.
Related Information:
By following these steps, you should be able to resolve the K3026 error and successfully perform the cost estimate for the material in question.
Get instant SAP help. Start your 7-day free trial now.
K3025
Material cannot be costed
What causes this issue? This material cannot be costed, according to the material type or the costing view in the material master.How to fix this err...
K3024
Cost estimate for material & does not exist
What causes this issue? You have not yet created a cost estimate for material &V1&.How to fix this error? Create a cost estimate for materia...
K3027
Cost estimate for material & has already been marked for release
What causes this issue? If a cost estimate is marked for release, the total value calculated by the cost estimate is transferred to the material mast...
K3028
Material master for cost estimate is incorrectly maintained
What causes this issue? You cannot create a <DS:GLOS.cost_estimate_without_quantity_structure>cost estimate without quantity structure</>...