Do you have any question about this error?
Message type: E = Error
Message class: K3 - Material Cost Estimate
Message number: 028
Message text: Material master for cost estimate is incorrectly maintained
You cannot create a
<DS:GLOS.cost_estimate_without_quantity_structure>cost estimate without
quantity structure</> for the specified material because
its <DS:GLOS.material_master_record>master record</> does not have a
costing view
the <DS:DE.CK_EKALREL>With quantity structure</> indicator in the
costing view of the material master record is set
the <GL:material_type>material type</> does not allow costing without a
quantity structure
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the material's master record, and create a costing view if
necessary.
<DS:TRAN.MM01>Create Material</>
Make sure that the <LS>With quantity structure</> indicator is not set
in the costing view of the material master record.
<DS:TRAN.MM02>Change Material</>
Make sure that the <LS>With quantity structure</> indicator is not set
for the material type.
Error message extract from SAP system. Copyright SAP SE.
K3028
- Material master for cost estimate is incorrectly maintained ?The SAP error message K3028, which states "Material master for cost estimate is incorrectly maintained," typically indicates that there is an issue with the material master data that is required for cost estimation in the SAP system. This error can arise due to various reasons related to the configuration or data maintenance of the material master.
Causes:
- Missing or Incorrect Data: The material master may be missing key information required for cost estimation, such as valuation class, costing view, or price control indicators.
- Inactive Costing View: The costing view of the material master may not be activated or properly maintained.
- Incorrect Valuation Class: The valuation class assigned to the material may not be compatible with the cost estimate.
- Material Type Restrictions: The material type may not be set up to allow for cost estimation.
- Plant-Specific Data: The plant-specific data for the material may be incomplete or incorrect.
Solutions:
Check Material Master Data:
- Go to transaction code
MM03
to display the material master.- Verify that the costing view is maintained and contains all necessary fields (e.g., standard price, moving average price, etc.).
- Ensure that the valuation class is correctly assigned.
Activate Costing View:
- If the costing view is not maintained, you can create or update it using transaction code
MM01
(Create Material) orMM02
(Change Material).- Ensure that the costing view is activated for the relevant plant.
Review Valuation Class:
- Check if the valuation class assigned to the material is valid and corresponds to the correct account determination settings in the configuration.
Check Material Type Settings:
- Ensure that the material type allows for cost estimation. You can check this in the configuration settings under
SPRO
->Logistics - General
->Material Master
->Basic Settings
->Material Types
.Plant-Specific Data:
- Ensure that all necessary plant-specific data is maintained for the material. This includes checking the plant-specific costing view.
Consult Documentation:
- Review SAP documentation or help resources for additional guidance on maintaining material master data for cost estimation.
Related Information:
Transaction Codes:
MM01
: Create MaterialMM02
: Change MaterialMM03
: Display MaterialCK11N
: Create Cost EstimateCK40N
: Change Cost EstimateSAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
User Roles and Authorizations: Ensure that the user has the necessary authorizations to view and edit material master data.
By following these steps, you should be able to identify and resolve the issue causing the K3028 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
K3027
Cost estimate for material & has already been marked for release
What causes this issue? If a cost estimate is marked for release, the total value calculated by the cost estimate is transferred to the material mast...
K3026
Material & in plant & can only be costed with quantity structure
What causes this issue? The <DS:DE.CK_EKALREL>With quantity structure</> indicator is set in the material master costing view of material...
K3029
The cost estimate has already been released
What causes this issue? You are trying to recost material &V1& plant &V2& or change an existing cost estimate. However, a standard co...
K3030
Cost component split cannot be determined for mat. & plant &
What causes this issue? No cost component split could be determined for material &V1&. The error occurred at the time of posting. The syste...
Click on this link to search all SAP messages.