How To Fix JITOUT112 - Item &2 of scheduling agreement &1 is not suitable for JIT calls


SAP Error Message - Details

  • Message type: E = Error

  • Message class: JITOUT - Messages for JIT Outbound

  • Message number: 112

  • Message text: Item &2 of scheduling agreement &1 is not suitable for JIT calls

  • Show details Hide details
  • What causes this issue?

    The production supply indicator has not been set to value 'Z' (=
    scheduling agreement for summarized JIT calls) in scheduling agreement
    &v1&, item &v2&, for material &v3&.

    System Response

    Further processing is possible, but no goods receipts can be posted for
    the calls in this scheduling agreement.

    How to fix this error?

    Change the production supply indicator for the scheduling agreement via
    the <DS:TRAN.ME32L>Change Scheduling Agreement</> function.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JITOUT112 - Item &2 of scheduling agreement &1 is not suitable for JIT calls ?

    The SAP error message JITOUT112 indicates that a specific item in a scheduling agreement is not suitable for Just-In-Time (JIT) calls. This error typically arises in the context of JIT delivery processes, where materials are delivered just in time for production, and certain conditions must be met for the items to be eligible for JIT calls.

    Cause:

    The error can be caused by several factors, including:

    1. Item Configuration: The item in question may not be configured correctly for JIT delivery. This could include missing or incorrect settings in the scheduling agreement or material master data.

    2. Delivery Schedule: The delivery schedule for the item may not align with JIT requirements. For example, the delivery dates may not be set up correctly, or the item may not have a valid JIT delivery schedule.

    3. Material Status: The material may have a status that prevents it from being used in JIT calls, such as being blocked for procurement or having a status that restricts its use in JIT processes.

    4. Quantity Issues: The quantity specified in the scheduling agreement may not meet the minimum requirements for JIT calls.

    5. Plant or Storage Location: The plant or storage location associated with the item may not be set up for JIT processing.

    Solution:

    To resolve the JITOUT112 error, you can take the following steps:

    1. Check Item Configuration:

      • Review the scheduling agreement for the item and ensure that it is configured for JIT delivery. Check the relevant fields in the scheduling agreement and ensure they are correctly set.
    2. Review Delivery Schedule:

      • Verify the delivery schedule for the item. Ensure that the delivery dates and quantities are appropriate for JIT calls.
    3. Material Master Data:

      • Check the material master data for the item. Ensure that the material is not blocked for procurement and that it has the necessary settings for JIT processing.
    4. Adjust Quantities:

      • If the quantity is an issue, adjust the quantities in the scheduling agreement to meet the minimum requirements for JIT calls.
    5. Plant and Storage Location:

      • Ensure that the plant and storage location are correctly set up for JIT processing. Check if there are any specific settings or configurations required for JIT in the plant or storage location.
    6. Consult Documentation:

      • Refer to SAP documentation or consult with your SAP support team for specific configurations related to JIT processing.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as ME33K (Display Scheduling Agreement) or ME32K (Change Scheduling Agreement) to review and modify the scheduling agreement.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on JIT configuration.
    • User Roles: Ensure that you have the necessary authorizations to make changes to scheduling agreements and material master data.

    By following these steps, you should be able to identify the cause of the error and implement the necessary changes to resolve it. If the issue persists, consider reaching out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author