Message type: E = Error
Message class: JA - Central error messages, project system
Message number: 007
Message text: No authorization for profit center & action &
You don't have all the authorizations that are necessary to display or
edit project definition &V3&.
The authorization for Profit Center (C_PROJ_PRC) was checked with the
values:
Profit Center (PRCTR),,&V1&
Action (ACTVT),,&V2&
INCLUDE 'NA_ALLG_AKTIVIT-T' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_BERECHTIGUNG' OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
JA007
- No authorization for profit center & action & ?The SAP error message JA007 indicates that a user does not have the necessary authorization to perform an action related to a specific profit center. This error typically arises in the context of financial transactions, particularly when dealing with profit center accounting.
Cause:
- Missing Authorization: The user lacks the required authorization for the specified profit center. This could be due to missing roles or authorizations in their user profile.
- Incorrect Profit Center Assignment: The profit center may not be correctly assigned to the user’s role or may not exist in the system.
- Authorization Object: The authorization object related to profit center accounting (e.g.,
K_AUSW
) may not be properly configured for the user.Solution:
- Check User Roles: Verify the roles assigned to the user in transaction
SU01
(User Maintenance). Ensure that the user has the necessary roles that include authorization for the relevant profit center.- Review Authorization Objects: Use transaction
SU53
immediately after the error occurs to check which authorization object is causing the issue. This will provide insight into what specific authorization is missing.- Modify Authorizations: If the user lacks the necessary authorizations, you may need to modify their roles or create a new role that includes the required authorizations for the profit center.
- Consult with Security Team: If you do not have the necessary permissions to change user roles or authorizations, contact your SAP security team or administrator for assistance.
- Testing: After making changes, have the user log out and back in, or test the transaction again to ensure that the issue is resolved.
Related Information:
K_AUSW
(Authorization for Profit Center Accounting).SU01
: User MaintenanceSU53
: Display Authorization CheckPFCG
: Role MaintenanceBy following these steps, you should be able to identify and resolve the authorization issue related to the profit center in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
JA006
No authorization for controlling area & action &
What causes this issue? You do not have all the necessary authorizations for display or working with the WBS element &V3&. The system checks ...
JA005
No authorization for controlling area & action &
What causes this issue? You do not have all the necessary authorizations to display or work with the project definition &V3&. The system chec...
JA008
No authorization for profit center & action &
What causes this issue? You do not have all the authorizations necessary to display or edit the WBS element &V3&. The system checks the autho...