Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: J3 - Dialog Messages for Data Pool Entry Transactions
Message number: 032
Message text: Method of apport. for res. for comp. not suitable for 'No C/U split'
No operating concern was found for the current company code '&V1&', or
the assigned operating concern is inactive.
The system cannot save the data record.
Check the organizational structures you have set up in Customizing. In
particular, check which operating concern is assigned to company code '
&V1&' (via a controlling area), and whether the operating concern is
active.
Error message extract from SAP system. Copyright SAP SE.
J3032
- Method of apport. for res. for comp. not suitable for 'No C/U split' ?The SAP error message J3032, which states "Method of apport. for res. for comp. not suitable for 'No C/U split'," typically occurs in the context of cost allocation or resource planning within SAP's Controlling (CO) module. This error indicates that the method of allocation you are trying to use is not compatible with the settings for the cost object or the resource in question.
Cause:
- Incompatible Allocation Method: The allocation method you are trying to use is not suitable for the configuration of the cost object. For example, if the cost object is set to "No Cost/Usage Split," it means that the system is not expecting to split costs based on usage, which may conflict with the allocation method you are trying to apply.
- Configuration Issues: There may be configuration settings in the controlling area or the specific cost center that do not align with the allocation method being used.
- Master Data Settings: The master data for the cost center or internal order may not be set up correctly, leading to this error.
Solution:
- Check Allocation Method: Review the allocation method you are using and ensure it is appropriate for the cost object. If the cost object is set to "No C/U split," consider using a different allocation method that is compatible.
- Adjust Configuration: If necessary, adjust the configuration settings in the controlling area or the specific cost center to allow for the desired allocation method. This may involve changing the settings related to cost allocation or usage splitting.
- Review Master Data: Check the master data for the cost center or internal order to ensure that it is set up correctly. Look for any inconsistencies or settings that may be causing the conflict.
- Consult Documentation: Refer to SAP documentation or help resources for guidance on the specific allocation methods and their compatibility with different cost object settings.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Controlling for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
J3319
Company code &, transaction &: Level number requires individual dates
What causes this issue? An incremental number was assigned to the data record (condition). Within an external data transfer context, the assignment o...
J3318
Company code &, transaction &: Update rule incorrect
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
J3320
Company code &, transaction &: Frequency (days/months) incorrect
What causes this issue? The entries for the frequency are not correct. Frequencies can not be specified for individual dates (see: update rules). Bot...
J3321
No authorization for & &
What causes this issue? A problem occurred while checking authorization. You are not authorized to carry out the desired action.System Response The ...
Click on this link to search all SAP messages.