Do you have any question about this error?
Message type: E = Error
Message class: J2 - Message Class for Development Class JBT
Message number: 054
Message text: Results analysis values deleted
The closure of the calculated period was set as a costing parameter.
The costing date selected does not correspond to the period end.
Costing is terminated.
If the costed period needs to be closed, select the period end as the
costing date. If the costing date does not correspond to the period
end, you cannot select the costing parameter <DS:DE.JBJPERA>close
period </>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
J2054
- Results analysis values deleted ?The SAP error message J2054, which states "Results analysis values deleted," typically occurs in the context of results analysis (RA) in SAP Controlling (CO). This message indicates that the results analysis values for a particular project or order have been deleted, which can happen for various reasons.
Causes:
- Manual Deletion: Users may have manually deleted results analysis values for a project or order.
- Data Consistency Issues: There may be inconsistencies in the data that lead to the deletion of results analysis values.
- Configuration Changes: Changes in configuration settings related to results analysis can lead to the deletion of existing values.
- Posting Errors: Errors during posting or closing periods can also result in the deletion of results analysis values.
- Programmatic Deletion: Custom programs or scripts that manipulate results analysis data may inadvertently delete values.
Solutions:
- Check for Manual Deletion: Review user activities to determine if the deletion was performed manually. If so, restore the values if possible.
- Data Consistency Check: Run consistency checks in the system to identify and rectify any inconsistencies in the data.
- Review Configuration Settings: Ensure that the configuration settings for results analysis are correct and have not been altered inappropriately.
- Repost Results Analysis: If the values were deleted due to posting errors, you may need to repost the results analysis for the affected project or order.
- Consult Logs: Check system logs for any related error messages or warnings that could provide more context on why the values were deleted.
- Restore from Backup: If the deletion is significant and cannot be resolved through other means, consider restoring the data from a backup if available.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
J2539
&4(Co.code &1, trans. &2) Total (&3) not equal to commitment capital (&4)
What causes this issue? The sum of the individual disbursements resulting from the disbursement procedure is not the same as the commitment capital o...
J2538
&4 (Co.code &1, trans. &2) No entries for disbursement procedure
What causes this issue? The disbursement procedure contains no entries. At least one record needs to be available.System Response The entry can not ...
J2540
&4 (Co. code &1, trans. &2) Planned disbursement date incorrect
What causes this issue? The planned disbursement point does not fall within the first fixed interest rate period of the transaction.System Response ...
J2541
&4 (Co. code &1, trans. &2) Partial waivers cover committed capital
What causes this issue? The sum of all partial relinquishments can not be the same as the commitment capital. In this case, there is a full relinquis...
Click on this link to search all SAP messages.