Message type: E = Error
Message class: IW - Order Processing
Message number: 511
Message text: Start/end dates of WBS element copied into the order header
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
IW511
- Start/end dates of WBS element copied into the order header ?The SAP error message IW511 indicates that there is an issue with the start and end dates of a Work Breakdown Structure (WBS) element being copied into the order header. This typically occurs in the context of project management and order processing within SAP, particularly when dealing with project-related orders.
Cause:
The error message IW511 is triggered when the start and end dates of the WBS element do not align with the expected date range for the order. This can happen due to several reasons:
- Date Mismatch: The start and end dates of the WBS element may not match the dates defined in the order or may fall outside the permissible range.
- WBS Element Status: The WBS element may be in a status that does not allow it to be used for order creation.
- Configuration Issues: There may be configuration settings in the project system or order management that restrict the copying of dates from WBS elements to orders.
- Missing Data: The WBS element may not have valid start and end dates defined.
Solution:
To resolve the IW511 error, you can take the following steps:
Check WBS Element Dates:
- Navigate to the WBS element in question and verify its start and end dates. Ensure that they are correctly defined and fall within the expected range for the order.
Review Order Dates:
- Check the order header dates to ensure they are compatible with the WBS element dates. Adjust the order dates if necessary.
WBS Element Status:
- Ensure that the WBS element is in an active status that allows it to be used for order creation. If it is in a locked or inactive status, you may need to change it.
Configuration Settings:
- Review the configuration settings in the project system (CNS) and order management (CO) to ensure that there are no restrictions on copying dates from WBS elements to orders.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on the IW511 error and any related configuration settings.
Testing:
- After making the necessary adjustments, try to create the order again to see if the error persists.
Related Information:
CJ20N
(Project Builder) to check WBS elements and IW31
(Create Order) to create orders.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems and order management.
Get instant SAP help. Sign up for our Free Essentials Plan.
IW510
Start/end dates of network activity copied into order header
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IW509
Rule for allocation of PM order to PS network is not maintained
What causes this issue? Assignment of the PM order to an operation of a PS network is not possible.System Response You did not maintain the assignme...
IW512
Order number identical with network number
What causes this issue? You are trying to maintain the assignment of a PM order to a network in the Project System. However, you have entered the num...
IW513
Old WBS element remains unchanged
What causes this issue? You have linked the <DS:GLOS.maintenance_order>maintenance order</> to the operation of a <DS:GLOS.network>...