Message type: E = Error
Message class: IW - Order Processing
Message number: 509
Message text: Rule for allocation of PM order to PS network is not maintained
Assignment of the PM order to an operation of a PS network
is not possible.
You did not maintain the assignment rule for PM orders to operations
from PS networks.
You maintain the assignment rule in Customizing for the project system,
under the heading 'Define parameters for subnetworks'.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message IW509, which states "Rule for allocation of PM order to PS network is not maintained," typically occurs in the context of Project System (PS) and Plant Maintenance (PM) integration. This error indicates that there is a missing configuration or rule that governs how PM orders are allocated to PS networks.
Cause:
- Missing Configuration: The allocation rules between PM orders and PS networks have not been defined in the system.
- Incorrect Settings: The settings for the allocation of PM orders to PS networks may be incorrectly configured or not aligned with the project structure.
- Project Structure Issues: The project structure may not be set up correctly, leading to issues in how orders are linked to networks.
Solution:
To resolve the IW509 error, you can follow these steps:
Check Allocation Rules:
- Go to the configuration settings in SAP for PM and PS integration.
- Navigate to the path: SPRO > Project System > Integration with Other SAP Components > Integration with Plant Maintenance > Define Allocation Rules for PM Orders to PS Networks.
- Ensure that the allocation rules are defined correctly. If they are missing, you will need to create them based on your business requirements.
Review Project Structure:
- Ensure that the project structure (WBS elements, networks, etc.) is correctly set up and that the PM orders are linked to the appropriate networks.
- Check if the network is assigned to the correct WBS element.
Check Order Types:
- Verify that the order types used in PM are compatible with the PS network. Sometimes, specific order types may not be allowed for allocation to networks.
Test the Configuration:
- After making changes, test the configuration by creating a new PM order and attempting to allocate it to a PS network to ensure that the error does not reoccur.
Consult Documentation:
- Refer to SAP documentation or help files for detailed guidance on setting up allocation rules and troubleshooting related issues.
Seek Help from SAP Support:
- If the issue persists after checking the configuration, consider reaching out to SAP support for further assistance.
Related Information:
IW31
(Create PM Order), IW32
(Change PM Order), and CJ20N
(Project Builder) to manage PM orders and PS networks.By following these steps, you should be able to resolve the IW509 error and ensure proper allocation of PM orders to PS networks in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
IW508 No network activity maintained, dates copied from WBS element
What causes this issue? You are trying to copy dates from a project (consisting...
IW507 Dates cannot be copied as no WBS element has been maintained
Self-Explanatory Message Since SAP believes that this specific error message is ...
IW510 Start/end dates of network activity copied into order header
Self-Explanatory Message Since SAP believes that this specific error message is ...
IW511 Start/end dates of WBS element copied into the order header
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.