Do you have any question about this error?
Message type: E = Error
Message class: ISUPRP - Nachrichten zum Produktvorschlag
Message number: 036
Message text: The budget billing period is identical to the simulation period: &1 days
The budget billing period is identical to the simulation period of
&1 days.
The simulation period in days for the customer consumption header and
the budget billing simulation period in days for the segment risk class
are identical.
This message is raised when both values are identical.
Change either one of the values to a different time period.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
ISUPRP036
- The budget billing period is identical to the simulation period: &1 days ?The SAP error message ISUPRP036 indicates that there is a conflict between the budget billing period and the simulation period in the system. Specifically, it means that the duration of the budget billing period is the same as the simulation period, which is not allowed.
Cause:
This error typically arises when:
- The budget billing period is set to the same length as the simulation period.
- There may be a configuration issue in the budget billing settings.
- Incorrect data entry or settings in the billing or simulation parameters.
Solution:
To resolve this error, you can take the following steps:
Check Configuration Settings:
- Navigate to the configuration settings for budget billing in your SAP system.
- Ensure that the budget billing period and simulation period are defined correctly and are not set to be identical.
Adjust Periods:
- If the budget billing period is indeed the same as the simulation period, modify one of them to ensure they are different. For example, you could extend the budget billing period or shorten the simulation period.
Review Data Entry:
- Check the entries made for the budget billing and simulation. Ensure that the dates and durations are entered correctly and do not overlap.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidelines on setting up budget billing and simulation periods.
Testing:
- After making adjustments, run a test to ensure that the error does not reoccur and that the budget billing process works as intended.
Seek Support:
- If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
FSE1
for budget billing plan maintenance.By following these steps, you should be able to resolve the ISUPRP036 error and ensure that your budget billing and simulation periods are configured correctly.
Get instant SAP help. Start your 7-day free trial now.
ISUPRP035
Contract &1 (Segment &2 ): Installation &3 has no rate category at &4
What causes this issue? Contract <(>&<)>V1& (Segment <(>&<)>V2& ): Installation <(>&<)>V3&a...
ISUPRP034
Contract &1 (Product &2 ): Installation &3 has no rate category at &4
What causes this issue? Contract <(>&<)>V1& (Product <(>&<)>V2& ): Installation <(>&<)>V3&am...
ISUPRP037
Missing values for off-peak consumption on/off-peak. Enter missing value
What causes this issue? Missing values for off-peak consumption for on-/off-peak register. Enter missing values.System Response The system displays ...
ISUPRP038
Billing document &1 ( Start &2, End &3) has too many days ( &4 )
What causes this issue? Technical problem: (Operand category QUANT) Billing document <(>&<)>V1& (Start <(>&<)>V2&...
Click on this link to search all SAP messages.