Do you have any question about this error?
Message type: E = Error
Message class: ISUPRP - Nachrichten zum Produktvorschlag
Message number: 038
Message text: Billing document &1 ( Start &2, End &3) has too many days ( &4 )
Technical problem: (Operand category QUANT)
Billing document <(>&<)>V1& (Start <(>&<)>V2&, End <(>&<)>V3
&) has a billing period of <(>&<)>V4& days. However, the
sample function module ISU_GET_HIST_CONS_SAMPLE_PRP can only deal with a
maximum length of 9999 days for all billing periods that are analyzed (
ee parameter X_DOC_NUMBER ).
Check your document with regard to the length of the billing period. If
the length is correct, you need to write your own module by copying the
one above and making changes in routine fill_consump_tab. As this might
lead to further changes, check the business process thoroughly.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
ISUPRP038
- Billing document &1 ( Start &2, End &3) has too many days ( &4 ) ?The SAP error message ISUPRP038 indicates that a billing document has exceeded the maximum number of days allowed for processing. This typically occurs in the context of billing and invoicing processes, where there are constraints on the duration for which billing documents can remain open or pending.
Cause:
The error message ISUPRP038 is triggered when the number of days between the start date and end date of a billing document exceeds the predefined limit set in the system. This limit is often configured in the system settings to ensure timely billing and to avoid issues related to outdated documents.
Solution:
To resolve this error, you can take the following steps:
Check Configuration Settings:
- Review the configuration settings related to billing document processing in your SAP system. This can typically be found in the customizing settings under the relevant billing or invoicing module.
- Look for parameters that define the maximum number of days allowed for billing documents.
Adjust the Days Limit:
- If the current limit is too restrictive for your business processes, consider increasing the maximum number of days allowed for billing documents. This adjustment should be made with caution and in consultation with relevant stakeholders.
Review Billing Document Dates:
- Check the start and end dates of the billing document in question. Ensure that they are set correctly and that the document is not unnecessarily delayed.
Close or Process Old Billing Documents:
- If there are old billing documents that are causing the issue, consider processing or closing them to free up space for new documents.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on how to manage billing document settings and limits.
Contact SAP Support:
- If the issue persists or if you need further assistance, consider reaching out to SAP support for guidance tailored to your specific system configuration.
Related Information:
SPRO -> SAP Reference IMG -> Sales and Distribution -> Billing -> Billing Document -> Define Maximum Number of Days for Billing Documents
.By following these steps, you should be able to address the ISUPRP038 error and ensure that your billing processes run smoothly.
Get instant SAP help. Start your 7-day free trial now.
ISUPRP037
Missing values for off-peak consumption on/off-peak. Enter missing value
What causes this issue? Missing values for off-peak consumption for on-/off-peak register. Enter missing values.System Response The system displays ...
ISUPRP036
The budget billing period is identical to the simulation period: &1 days
What causes this issue? The budget billing period is identical to the simulation period of &1 days. The simulation period in days for the custome...
ISUPRP039
Billing document &1 (Start &2, End &3):Addition leads to overflow (&4)
What causes this issue? Technical problem: (Operand category QUANT ) Billing document <(>&<)>V1& (Start <(>&<)>V2...
ISUPRP040
Billing document &1 (Start &2,End &3) has too many days ( &4 )( DEMAND)
What causes this issue? Technical problem: (Operand category DEMAND) Billing document <(>&<)>V1& (Start <(>&<)>V2...
Click on this link to search all SAP messages.