Do you have any question about this error?
Message type: E = Error
Message class: IST_EBS - Interface Between IS-T and External Billing System
Message number: 153
Message text: Parallelization-object and/or -variant are not maintained (-> long text)
When you start a parallel mass activity, you must enter a parallel
processing object and a parallel processing variant. This information
is required to create intervals. In this case, either the parallel
processing object or variant is not maintained.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
In the case of an immediate start:
Copy the existing mass run and choose a different ID. Maintain the
parallel processing variant. Now you can start the new mass run. You
can create a new variant by choosing 'Variant maintenance' if required.
Error message extract from SAP system. Copyright SAP SE.
IST_EBS153
- Parallelization-object and/or -variant are not maintained (-> long text) ?The SAP error message IST_EBS153 indicates that there is an issue with the parallelization object and/or variant not being maintained in the context of a specific process, typically related to the Electronic Bank Statement (EBS) processing or similar batch jobs.
Cause:
This error usually occurs when:
- Missing Configuration: The parallelization object or variant required for the job is not defined or maintained in the system.
- Incorrect Job Setup: The job that is being executed is not properly configured to handle parallel processing.
- Authorization Issues: There may be authorization issues preventing the system from accessing the required objects or variants.
Solution:
To resolve the IST_EBS153 error, you can follow these steps:
Check Parallelization Settings:
- Go to the transaction code where the job is defined (e.g., SM37 for job monitoring).
- Verify the job configuration and ensure that the parallelization object and variant are correctly set up.
Maintain Variants:
- Use transaction code SE38 or SA38 to access the program associated with the job.
- Check if the required variant is created and maintained. If not, create a new variant with the necessary parameters.
Review Job Definition:
- Ensure that the job definition includes the correct parallelization object. You can do this by checking the job's attributes in the job scheduling area.
Authorization Check:
- Ensure that the user executing the job has the necessary authorizations to access the parallelization object and variant.
Consult Documentation:
- Review SAP documentation or notes related to the specific transaction or program you are working with for any additional configuration steps that may be required.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance, especially if this is a recurring issue.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the IST_EBS153 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
IST_EBS152
The data string in line &1 of IDoc &2 could not be converted
What causes this issue? While the system was converting data, a short dump occurred.System Response The system issues an error message and will not ...
IST_EBS151
Line &1 of IDoc &2 has an unexpected segment name
What causes this issue? The function module called can only process segments of a certain type. The current document contains a segment type that can...
IST_EBS154
No document exists for the triple AWTYP = &1, AWSYS = &2, AWKEY = &3
What causes this issue? There is no RM-CA document that contains the specified values in the AWSYS, AWTYP and AWKEY fields. This means that the exter...
IST_EBS155
All documents identified by IDoc &1 were successfully reversed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.