Message type: E = Error
Message class: HRPIQ00PROGRESSION - Progession Messages
Message number: 051
Message text: Check-to date &1 is not between &2 and &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message HRPIQ00PROGRESSION051 indicates that there is an issue with the "Check-to date" in a progression or evaluation process. Specifically, the error states that the "Check-to date" (&1) is not within the specified range of dates (&2 to &3). This typically occurs in the context of personnel administration or talent management modules where date validations are crucial for processing employee data.
Cause: Date Range Violation: The "Check-to date" you are trying to enter is outside the allowed range defined by the system. The range is usually set by the start date and end date of a specific evaluation period or progression criteria. Incorrect Data Entry: The date might have been entered incorrectly, either manually or through a data import process.
Configuration Issues: There may be configuration settings in the system that define valid date ranges for specific processes, and these may not align with the data being processed.
Solution: Verify Dates: Check the "Check-to
Get instant SAP help. Sign up for our Free Essentials Plan.
HRPIQ00PROGRESSION050 Error in VSR/BRF+ result for program type &1 and progression category &2
What causes this issue? The progression result determined by the VSR rules is not permissible for program type &V1& and progression category ...
HRPIQ00PROGRESSION049 Only the last progression result may be changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRPIQ00PROGRESSION052 Only the last progression result may be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRPIQ00PROGRESSION053 Progression result already exists for check-to date &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.