Message type: E = Error
Message class:  HRPBSAT_RA - HR: Public Sector Austria II 
Message number: 016
Message text: End date must be the last day of the month
The end date is not the last day of a month. As side charge bonus points
can only be assigned on a month basis, the end date should be the last
day of a month.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Change the end date.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message HRPBSAT_RA016, which states "End date must be the last day of the month," typically occurs in the context of payroll processing or when managing employee data in SAP HR (Human Resources) modules. This error indicates that the end date you are trying to enter for a specific record (such as a payroll period, contract, or other time-related data) does not correspond to the last day of the month.
Cause: Incorrect End Date: The end date you have entered is not the last day of the month. For example, if you are trying to set an end date for February, it should be either the 28th or 29th (in a leap year).
Configuration Issues: There may be configuration settings in the SAP system that enforce this rule for specific types of records. Data Entry Error: A simple typographical error when entering the date could lead to this message.
Solution: Check the End Date:
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
HRPBSAT_RA015 Start date is not first day of the month
What causes this issue?  The start date is not the start of a month. As side charge bonus points can only be assigned on a month basis, the start date...
HRPBSAT_RA014 Module &1, wage type &2: Only unit of measure for percentage possible
What causes this issue?  In the wage type characteristics, Unit of Time/Measure is not maintained correctly.System Response  For manual % entry (IT001...
HRPBSAT_RA017 Separation date &1 is between start date &2 and end date &3
What causes this issue?  The separation date defined in feature APNWR is between the start and end date of the infotype record.System Response  The sy...
HRPBSAT_RA018 Enter the side charge bonus point monthly
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.