Message type: E = Error
Message class:  HRPBSAT_RA - HR: Public Sector Austria II 
Message number: 015
Message text: Start date is not first day of the month
The start date is not the start of a month.
As side charge bonus points can only be assigned on a month basis, the
start date must be the start of a month.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Change the start date to the start of the month.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message HRPBSAT_RA015, which states "Start date is not first day of the month," typically occurs in the context of payroll processing or when managing employee benefits in SAP HR (Human Resources) modules. This error indicates that the start date for a specific payroll period or benefit assignment does not align with the expected first day of the month.
Cause: Incorrect Start Date: The start date entered for a payroll run, infotype, or benefit assignment is not set to the first day of the month. For example, if the expected start date is January 1st, but the user has entered January 15th, this error will occur.
Configuration Issues: There may be configuration settings in the SAP system that require certain dates to be aligned with the beginning of the month for payroll calculations or benefit eligibility. Data Entry Errors: Manual data entry mistakes can lead to incorrect dates being inputted.
Solution: Correct the Start
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
HRPBSAT_RA014 Module &1, wage type &2: Only unit of measure for percentage possible
What causes this issue?  In the wage type characteristics, Unit of Time/Measure is not maintained correctly.System Response  For manual % entry (IT001...
HRPBSAT_RA013 Module &1, wage type &2: Only unit of meas. for DIMENSION = TIME possible
What causes this issue?  In the wage type characteristics, Unit of Time/Measure is not maintained correctly.System Response  In IT0008 maintenance, th...
HRPBSAT_RA016 End date must be the last day of the month
What causes this issue?  The end date is not the last day of a month. As side charge bonus points can only be assigned on a month basis, the end date ...
HRPBSAT_RA017 Separation date &1 is between start date &2 and end date &3
What causes this issue?  The separation date defined in feature APNWR is between the start and end date of the infotype record.System Response  The sy...
Click on this link to search all SAP messages.