Do you have any question about this error?
Message type: E = Error
Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan
Message number: 079
Message text: System error while locking cost planning object &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
HRHCP00_PLAN079
- System error while locking cost planning object &1 ?The SAP error message HRHCP00_PLAN079 indicates a system error that occurs while attempting to lock a cost planning object. This error typically arises in the context of Human Capital Management (HCM) or related modules where cost planning is involved.
Cause:
The error can be caused by several factors, including:
- Concurrency Issues: Another user or process may already be locking the cost planning object, preventing your transaction from acquiring the necessary lock.
- Database Locking: The database may have a lock on the object due to a previous transaction that did not release the lock properly.
- System Configuration: There may be issues with the configuration of the cost planning module or related settings in the SAP system.
- Technical Issues: There could be underlying technical issues, such as problems with the database or application server.
Solution:
To resolve the HRHCP00_PLAN079 error, you can try the following steps:
Check for Existing Locks:
- Use transaction code SM12 to check for existing locks on the cost planning object. If you find locks that are no longer needed, you can delete them (ensure that you have the necessary authorizations to do so).
Retry the Operation:
- Sometimes, simply retrying the operation after a short period can resolve the issue, especially if it was caused by a temporary lock.
Review User Sessions:
- Check if other users are working on the same cost planning object. If possible, coordinate with them to avoid conflicts.
System Logs:
- Review the system logs (transaction code SM21) for any related error messages or warnings that could provide more context about the issue.
Check Configuration:
- Ensure that the configuration for cost planning is set up correctly. This may involve reviewing settings in the IMG (Implementation Guide).
Contact SAP Support:
- If the issue persists and you cannot identify the cause, consider reaching out to SAP Support for assistance. Provide them with the error message details and any relevant logs.
Related Information:
Transaction Codes:
Documentation: Refer to SAP Help documentation for more details on cost planning and locking mechanisms in the HCM module.
User Authorizations: Ensure that the user has the necessary authorizations to perform cost planning activities.
By following these steps, you should be able to diagnose and resolve the HRHCP00_PLAN079 error effectively.
Get instant SAP help. Start your 7-day free trial now.
HRHCP00_PLAN078
The cost planning object &1 is locked by user &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRHCP00_PLAN077
Plan &1 &2 has not yet been posted; no cancellation possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRHCP00_PLAN080
Cost plan &3 contains the cost object &4 times between &1 and &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRHCP00_PLAN081
No multiple object assignments found for plan &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.