Do you have any question about this error?
Message type: E = Error
Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan
Message number: 074
Message text: Error while converting documents: cannot assign period &1 to amount field
Line item &v2& relates to posting period &V1&. For this period there is
no amount field in the BAPI structure. The SAP system only processes
values for the periods 1 to 6.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
HRHCP00_PLAN074
- Error while converting documents: cannot assign period &1 to amount field ?The SAP error message HRHCP00_PLAN074 typically occurs in the context of Human Capital Management (HCM) when there is an issue with the planning or budgeting process, particularly when trying to assign a specific period to an amount field in a planning document. This error can arise due to various reasons, including data inconsistencies, configuration issues, or incorrect input values.
Cause:
- Invalid Period Assignment: The specified period (&1) may not be valid for the amount field being processed. This could be due to the period being closed or not available for planning.
- Data Inconsistencies: There may be inconsistencies in the data being processed, such as missing or incorrect entries in the planning tables.
- Configuration Issues: The configuration settings for the planning process may not be set up correctly, leading to issues when trying to assign periods to amounts.
- Authorization Issues: The user may not have the necessary authorizations to perform the action, leading to errors when trying to assign values.
Solution:
- Check Period Validity: Verify that the period you are trying to assign is open and valid for the planning process. You can do this by checking the period settings in the relevant configuration.
- Review Input Data: Ensure that all input data is correct and complete. Look for any missing or incorrect entries that could be causing the error.
- Configuration Review: Review the configuration settings related to the planning process in SAP. Ensure that all necessary settings are correctly configured.
- Authorization Check: Ensure that the user has the necessary authorizations to perform the action. If not, contact your SAP security administrator to grant the required permissions.
- Debugging: If the issue persists, consider using the SAP debugging tools to trace the error and identify the exact point of failure in the process.
Related Information:
HRP4
(for planning) or S_AHR_61016300
(for reporting) to access relevant planning documents and settings.If the issue continues after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP directly for further assistance.
Get instant SAP help. Start your 7-day free trial now.
HRHCP00_PLAN073
Error in evaluation path for org. units in area of responsibility
What causes this issue? The SAP system tried to determine objects in your area of responsibility along the evaluation path &V1&. There are er...
HRHCP00_PLAN072
Error while determining org. struc. for objects in area of responsibility
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRHCP00_PLAN075
Error when converting documents: cannot assign period &1 to number field
What causes this issue? Line item &V2& relates to the posting period &V1&. For this period there is no number field in the BAPI struc...
HRHCP00_PLAN076
Could not read cost item table T77HCP_CITM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.