How To Fix H1159 - &1 &2 is not financed by the budget of this budget structure element


SAP Error Message - Details

  • Message type: E = Error

  • Message class: H1 - Messages Used in HR Funds and Position Management

  • Message number: 159

  • Message text: &1 &2 is not financed by the budget of this budget structure element

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message H1159 - &1 &2 is not financed by the budget of this budget structure element ?

    The SAP error message H1159 indicates that a specific budget structure element (such as a cost center, internal order, or project) does not have sufficient budget allocated to cover the transaction you are trying to post. This error typically occurs in the context of budget management within SAP, particularly in modules like Public Sector Management (PSM) or Controlling (CO).

    Cause:

    1. Insufficient Budget: The budget for the specified budget structure element has not been set up or is insufficient to cover the amount being posted.
    2. Budget Structure Element: The budget structure element (e.g., cost center, internal order) may not be correctly configured or may not exist in the budget structure.
    3. Budget Availability Control: The budget availability control settings may be too strict, preventing any postings that exceed the available budget.
    4. Incorrect Posting: The transaction being posted may be incorrectly assigned to a budget structure element that is not intended for that type of expense.

    Solution:

    1. Check Budget Availability: Review the budget assigned to the relevant budget structure element. Ensure that there is enough budget available to cover the transaction.

      • Use transaction codes like S_ALR_87013558 (for budget reports) to check the budget status.
    2. Adjust Budget: If the budget is insufficient, you may need to increase the budget allocation for that budget structure element. This can be done through the budget planning transactions (e.g., FMBB for budget entry).

    3. Review Configuration: Ensure that the budget structure element is correctly configured in the system. Check if it is included in the relevant budget structure and if it is set up for budget availability control.

    4. Modify Posting: If the transaction is incorrectly assigned, modify the posting to use the correct budget structure element that has sufficient budget.

    5. Consult with Finance Team: If you are unsure about the budget allocations or configurations, consult with your finance or controlling team for assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • FMBB: Budget Entry
      • FMAVCR01: Availability Control
      • S_ALR_87013558: Budget Reports
    • Documentation: Review SAP documentation or help files related to budget management and availability control for more detailed guidance.
    • User Roles: Ensure that you have the necessary authorizations to view and modify budget information in SAP.

    By following these steps, you should be able to resolve the H1159 error and ensure that your budget management processes in SAP are functioning correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author