Do you have any question about this error?
Message type: E = Error
Message class: GPDPEG - A&D GPD message classed used by Pegging only
Message number: 103
Message text: Invalid subcontracting order &1 item &2 item category &3
The system has encountered an invalid subcontracting order.
Order number: &V1&
Line item: &V2&
Item category: &V3&
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Make required changes to the subcontracting order.
Error message extract from SAP system. Copyright SAP SE.
GPDPEG103
- Invalid subcontracting order &1 item &2 item category &3 ?The SAP error message GPDPEG103 indicates an issue with a subcontracting order in the system. This error typically arises when there is a problem with the configuration or data related to the subcontracting process. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
Invalid Item Category: The item category specified in the subcontracting order may not be valid for the type of order you are processing. This can happen if the item category is not set up correctly in the system or if it is not allowed for subcontracting.
Missing Configuration: The configuration for subcontracting in the material master or the purchasing info record may be incomplete or incorrect.
Incorrect Order Type: The order type used may not support subcontracting or may not be configured to handle the specific item category.
Data Inconsistencies: There may be inconsistencies in the data related to the material, vendor, or the specific order that is causing the error.
Solution:
Check Item Category: Verify that the item category used in the subcontracting order is valid. You can do this by checking the configuration in the material master and ensuring that the item category is allowed for subcontracting.
Review Material Master Data: Ensure that the material master data for the items involved in the subcontracting order is correctly set up. Check the following:
- The procurement type (should be set to 'F' for external procurement).
- The item category group (should be appropriate for subcontracting).
Validate Purchasing Info Record: Check the purchasing info record for the vendor and material combination to ensure that it is set up correctly for subcontracting.
Examine Order Type Configuration: Ensure that the order type you are using is configured to handle subcontracting. You may need to consult with your SAP configuration team to verify this.
Check for Data Inconsistencies: Look for any inconsistencies in the data related to the order, such as missing or incorrect entries in the order itself, material master, or vendor master.
Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional guidance.
Related Information:
By following these steps, you should be able to identify and resolve the issue related to the GPDPEG103 error message in SAP. If the problem continues, it may be beneficial to involve your SAP support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
GPDPEG102
Group-to-group: account assigned group &3 not included in the current run
What causes this issue? A group-to-group transfer exists between the selected groups and &V3&, however &V3& is not included in the pe...
GPDPEG101
Group-to-group: receiving group &3 is not included in the current run
What causes this issue? A group-to-group transfer exists between the selected groups and &V3&, however &V3& is not included in the pe...
GPDPEG200
No MRP group for plant &1 material &4: replenishment &3 not pegged
What causes this issue? No MRP group maintained for material &V4& in plant &V1&<(>,<)> grouping WBS element &V2&....
GPDPEG201
MD04: Production order &3 dropped; Material is missing
What causes this issue? Production order &V3& has no material assigned to it. Plant: &V1& Grouping WBS element: &V2&System Re...
Click on this link to search all SAP messages.