Message type: E = Error
Message class: GPDPEG - A&D GPD message classed used by Pegging only
Message number: 200
Message text: No MRP group for plant &1 material &4: replenishment &3 not pegged
No MRP group maintained for material &V4& in plant &V1&<(>,<)>
grouping WBS element &V2&.
Replenishment &V3& cannot be pegged.
Maintain the MRP group setting of material &V4& in transaction <LB>MM02
</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GPDPEG200
- No MRP group for plant &1 material &4: replenishment &3 not pegged ?The SAP error message GPDPEG200 indicates that there is no MRP (Material Requirements Planning) group assigned for a specific plant and material combination, which is causing issues with the pegging of replenishment elements. This error typically arises in the context of production planning and inventory management.
Cause: Missing MRP Group: The primary cause of this error is that the material in question does not have an MRP group assigned in the material master data for the specified plant. Incorrect Configuration: The MRP group may not be configured correctly in the system, or it may not exist for the specified plant. Material Type Restrictions: Certain material types may not be allowed to have MRP groups assigned, leading to this error. Data Inconsistencies: There may be inconsistencies in the master data or configuration settings that prevent the system from finding the appropriate MRP group.
Solution: Check Material Master Data: Go to the material master record (transaction code MM03) for the
Get instant SAP help. Sign up for our Free Essentials Plan.
GPDPEG103
Invalid subcontracting order &1 item &2 item category &3
What causes this issue? The system has encountered an invalid subcontracting order. Order number: &V1& Line item: &V2& Item category:...
GPDPEG102
Group-to-group: account assigned group &3 not included in the current run
What causes this issue? A group-to-group transfer exists between the selected groups and &V3&, however &V3& is not included in the pe...
GPDPEG201
MD04: Production order &3 dropped; Material is missing
What causes this issue? Production order &V3& has no material assigned to it. Plant: &V1& Grouping WBS element: &V2&System Re...
GPDPEG202
MD04: Purchase order &3 dropped; Material is missing
What causes this issue? Purchase order &V3& has no material assigned to it. Plant: &V1& Grouping WBS element: &V2&System Resp...
Click on this link to search all SAP messages.