Do you have any question about this error?
Message type: E = Error
Message class: GPDARCH - GPD Archiving
Message number: 120
Message text: &1: Replen. object assigned to a WBS element outside of scope (WBS: &2)
Replenishment object &V1& is assigned to WBS element &V2&, which does
have an adequate archiving status.
Replenishment object &V1& and all subsequent replenishment objects are
ineligible for archiving.
If possible, maintain the archiving status of WBS element &V2& in
transaction <DS:TRAN.GPDARCH01>GPDARCH01</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GPDARCH120
- &1: Replen. object assigned to a WBS element outside of scope (WBS: &2) ?The SAP error message GPDARCH120 indicates that there is a problem with the assignment of a replenishment object to a Work Breakdown Structure (WBS) element. Specifically, the error states that the replenishment object is assigned to a WBS element that is outside the scope of the current project or context.
Cause:
- WBS Element Scope: The WBS element referenced in the error message (&2) is not valid for the current context or project. This could happen if the WBS element is not active, has been deleted, or is not part of the project structure you are currently working with.
- Replenishment Object Assignment: The replenishment object (e.g., a purchase order, stock transfer, etc.) is incorrectly linked to a WBS element that does not belong to the project or is not within the defined scope of the project.
- Project Structure Changes: Changes in the project structure, such as moving or deleting WBS elements, can lead to this error if the replenishment object is still referencing the old structure.
Solution:
- Verify WBS Element: Check the validity of the WBS element (&2) in the project structure. Ensure that it is active and correctly defined within the project.
- Reassign Replenishment Object: If the replenishment object is incorrectly assigned, reassign it to a valid WBS element that is within the scope of the project.
- Check Project Settings: Review the project settings and ensure that the WBS elements are correctly defined and that the replenishment objects are assigned to the appropriate elements.
- Consult Project Documentation: If there have been recent changes to the project structure, consult the project documentation to understand the current configuration and make necessary adjustments.
- SAP Notes and Support: If the issue persists, check for any relevant SAP Notes or patches that may address this specific error. You can also reach out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to resolve the error and ensure that your replenishment objects are correctly assigned within the project scope.
Get instant SAP help. Start your 7-day free trial now.
GPDARCH060
&1 <- >> FILTER_WBS BADI
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPDARCH059
&1 -> >> FILTER_WBS BADI
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPDARCH121
&1: Excess qty exists in pegging assignments for 'in stock' replenishment
What causes this issue? Excess quantity exists in pegging assignments for in-stock replenishment object &V1&System Response Replenishment ob...
GPDARCH122
&1: Under/over assigned replenishment object
What causes this issue? Replenishment object &V1& in under/over assigned.System Response Replenishment object &V1& and all subsequen...
Click on this link to search all SAP messages.