How To Fix GPD2013 - &2 cannot be assigned without an exception WBS on Group &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GPD2 - GPD for DIMP4.71 uses message class GPD & GPD2

  • Message number: 013

  • Message text: &2 cannot be assigned without an exception WBS on Group &1

  • Show details Hide details
  • What causes this issue?

    Exception handling in pegging refers to the way in which scrap,
    surplus, and stock difference ( lost / found ) replenishments are
    handled.
    Pegging Customizing is defined to have all the exceptions pegged to
    exception WBS elements (for each group).
    Thus, these exception WBS elements must be defined for each group.
    However, such a definition has not been made for each group.
    Pegging will not execute until you fix this problem.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    You can take one of the following two steps to fix this problem:
    1. Go to Pegging Customizing transaction ( 0PEG01 ) and change the way
    exceptions are handled.
    2. Go to transaction PEG04 and define exception WBS elements for each
    group.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GPD2013 - &2 cannot be assigned without an exception WBS on Group &1 ?
    The SAP error message GPD2013 indicates that there is an issue with assigning a project or a cost element to a Work Breakdown Structure (WBS) element in the context of project management. Specifically, the error states that the assignment cannot be made without an exception WBS on the specified group.
    
    Cause: The error typically arises due to one of the following reasons: Missing WBS Element: The system is trying to assign a cost or project element to a WBS element that does not exist or is not properly defined. Group Assignment Issues: The group specified in the error message may not have a valid WBS element associated with it, or the WBS element may not be set up to allow the assignment.
    Configuration Issues: There may be configuration settings in the project system that prevent the assignment of certain elements without a valid WBS.
    Solution: To resolve the GPD2013 error, you can take the following steps: Check WBS

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker