Do you have any question about this error?
Message type: E = Error
Message class: GPD2 - GPD for DIMP4.71 uses message class GPD & GPD2
Message number: 011
Message text: Please maintain the exception handling WBS elements
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GPD2011
- Please maintain the exception handling WBS elements ?The SAP error message GPD2011, which states "Please maintain the exception handling WBS elements," typically occurs in the context of project management and project system (PS) modules. This error indicates that there are issues related to the exception handling WBS (Work Breakdown Structure) elements in your project.
Cause:
- Missing Exception Handling WBS Elements: The system requires specific WBS elements to be defined for exception handling, and if these are not maintained, the error will occur.
- Configuration Issues: There may be configuration settings in the project system that are not properly set up, leading to the absence of required WBS elements.
- Project Structure: The project structure may not be correctly defined, or the WBS elements may not be linked properly to the project.
Solution:
Maintain Exception Handling WBS Elements:
- Go to the relevant transaction in SAP (usually through the Project System module).
- Navigate to the project where the error is occurring.
- Check the WBS elements associated with the project and ensure that the exception handling WBS elements are defined.
- If they are missing, create or maintain the necessary WBS elements.
Check Configuration:
- Review the configuration settings for the project system to ensure that exception handling is properly set up.
- You may need to consult with your SAP configuration team or refer to the SAP documentation for guidance on how to set up exception handling.
Review Project Structure:
- Ensure that the project structure is correctly defined and that all necessary links between WBS elements are established.
- Validate that the hierarchy of WBS elements is intact and that there are no missing links.
Consult Documentation:
- Refer to SAP Help documentation or guides specific to your version of SAP for detailed instructions on maintaining WBS elements and exception handling.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to access and maintain WBS elements.If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GPD2009
Internal data inconsistency; Plant: &1, Material: &2, STO &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPD2008
Pegging customizing is not fully maintained (Transaction 0PEG01)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPD2012
&2 cannot be assigned without an exception WBS on Plant &1
What causes this issue? Exception handling in pegging refers to the way in which scrap, surplus, and stock difference (lost / found ) replenishments ...
GPD2013
&2 cannot be assigned without an exception WBS on Group &1
What causes this issue? Exception handling in pegging refers to the way in which scrap, surplus, and stock difference ( lost / found ) replenishment...
Click on this link to search all SAP messages.