Do you have any question about this error?
Message type: E = Error
Message class: GPD - Pegging & Distribution
Message number: 018
Message text: Scrap for object & could not be assigned
<DS:GLOS.3526C48DAFAB52B9E10000009B38F974>Scrap</> for replenishment
element & could not be assigned.
The costs for the replenishment element cannot be fully distributed
during a further cost distribution run.
Create a separate WBS element for the <DS:TRAN.PEG04>assignemnt of
scrap</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GPD018
- Scrap for object & could not be assigned ?The SAP error message GPD018, which states "Scrap for object & could not be assigned," typically occurs in the context of production planning and control, particularly when dealing with scrap management in production orders or process orders. This error indicates that the system is unable to assign the specified scrap quantity to the relevant object (such as a production order, process order, or material).
Causes:
- Incorrect Configuration: The scrap configuration in the system may not be set up correctly, leading to issues in assigning scrap to the production order.
- Missing Master Data: The relevant master data (like material master, BOM, routing) may not be properly maintained or may be missing.
- Order Status: The production order or process order may be in a status that does not allow for scrap assignment (e.g., completed or closed).
- Quantity Mismatch: The scrap quantity being entered may exceed the available quantity or may not match the expected scrap percentage defined in the system.
- Authorization Issues: The user may not have the necessary authorizations to perform the scrap assignment.
Solutions:
- Check Configuration: Review the configuration settings for scrap in the production order. Ensure that the scrap settings are correctly defined in the relevant customizing settings (transaction code SPRO).
- Verify Master Data: Ensure that all relevant master data is correctly maintained. Check the material master, BOM, and routing for any discrepancies.
- Order Status: Check the status of the production or process order. If the order is completed or closed, you may need to reopen it or create a new order for further processing.
- Adjust Scrap Quantity: Ensure that the scrap quantity being entered is within acceptable limits and matches the expected scrap percentage.
- Check Authorizations: Verify that the user has the necessary authorizations to perform the scrap assignment. If not, contact your SAP security administrator to obtain the required permissions.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GPD017
Scrap for replenishment element &V1& could not be assigned
What causes this issue? <DS:GLOS.3526C48DAFAB52B9E10000009B38F974>Scrap</> could not be assigned for replenishment element<(>&&...
GPD016
Grouping WBS element & not processed since valuated stock + CO version 0
What causes this issue? You want to process a WBS element with valuated stock with the CO version 0. However, CO version 0 is only valid for unvaluat...
GPD019
No surplus WBS element defined for plant & and grouping WBS element &
What causes this issue? No scrap WBS element has been defined for the appropriate plant and grouping WBS element.System Response The scrap cannot be...
GPD020
No surplus WBS element defined for plant & and grouping WBS element &
What causes this issue? No scrap WBS element has been defined for plant &V1& and grouping WBS element &V2&.System Response Scrap can...
Click on this link to search all SAP messages.