Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 714
Message text: Cost element & is blocked for cost center & by the detail planning
The value of cost element &v1& was already determined for cost center
&v2& in curreny &v3& using detailed planning. A change with the data
transfer is only possible if it is completed by importing or copying a
different detailed planning.
The planned record to be transferred is entered in the error log.
If this message appeared during revaluation, note the following:
Planned values that are created by the detailed planning cannot be
revaluated by the revaluation program; they remain unchanged. Since the
detailed planning also works at the year level, you receive this error
message if you have not selected all periods for revaluation.
If you want to allow the detailed planning to be overwritten by the
normal planning, you can change the type of message in Customizing
using <DS:TRAN.OBA5>transaction OBA5</>.
To do so, proceed as follows:
Enter "GP" as the application area.
For message "714", entere the desired message type for dialog
processing. Use the following codes:
Code Message type
E = Error message
I = Information message
W = Warning
- = No message
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Only with type E (standard setting) is the block actually in place.Error message extract from SAP system. Copyright SAP SE.
GP714
- Cost element & is blocked for cost center & by the detail planning ?The SAP error message GP714 indicates that a specific cost element is blocked for a particular cost center due to detailed planning. This typically occurs in the context of controlling and financial planning within SAP, particularly when dealing with cost centers and cost elements in the Controlling (CO) module.
Cause: Blocking Configuration: The cost element may be configured to be blocked for certain cost centers in the system settings. This can happen if the cost element is not intended to be used for that cost center. Planning Version: The error may arise if the planning version being used is not allowed for the specified cost element and cost center combination. Authorization Issues: There may be authorization restrictions preventing the use of the cost element for the specified cost center. Master Data Issues: The cost element or cost center may not be properly set up in the master data, leading to inconsistencies.
Solution: Check Cost Element Configuration: Review
Get instant SAP help. Sign up for our Free Essentials Plan.
GP713
The planning record already exists
What causes this issue? The CO interface has been preconfigured so that existing plan records are not overwritten. &v1& with the key &v2&...
GP712
Plan the fixed and variable costs with the same sign
What causes this issue? You have transferred total costs to object &V1& and cost element &V2& the amounts of which are smaller than t...
GP750
Incorrect records have been written to file &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GP751
Errors that occurred in the integration checks:
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.