Do you have any question about this error?
Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 509
Message text: Cost center accounting is not active in controlling area/fiscal yr &/&
Cost center accounting is inactive in the controlling area &V1& which
you entered in fiscal year &V2&.
You can activate cost center accounting using the controlling area
control paramters. You can maintain these control parameters using a
customizing function.
Maintain the relevant control parameters if you actually want to plan
in controlling area &V1& and fiscal year &V2&, or
Correct your typing error.
Error message extract from SAP system. Copyright SAP SE.
GP509
- Cost center accounting is not active in controlling area/fiscal yr &/& ?The SAP error message GP509 indicates that cost center accounting is not active for the specified controlling area and fiscal year. This error typically arises when you attempt to perform activities related to cost center accounting, such as posting costs or creating cost centers, in a controlling area where cost center accounting has not been activated.
Cause:
- Cost Center Accounting Not Activated: The most common cause is that cost center accounting has not been activated for the controlling area in question.
- Fiscal Year Settings: The fiscal year settings may not be properly configured, or the fiscal year may not be open for postings.
- Configuration Issues: There may be issues with the configuration settings in the controlling area that prevent cost center accounting from being used.
Solution:
To resolve the GP509 error, you can follow these steps:
Activate Cost Center Accounting:
- Go to the SAP transaction code OKKP (Controlling Area: Settings).
- Select the controlling area that is causing the issue.
- Check if the "Cost Center Accounting" option is activated. If not, activate it.
Check Fiscal Year Settings:
- Use transaction code OB52 to check the open and closed periods for the controlling area.
- Ensure that the fiscal year and periods are open for postings.
Review Configuration:
- Ensure that all necessary configuration settings for cost center accounting are correctly set up in the controlling area.
- Check if the controlling area is properly assigned to the company code.
Consult Documentation:
- Review SAP documentation or consult with your SAP Basis or Controlling module consultant for any specific configurations that may be required.
Testing:
- After making the necessary changes, perform a test transaction to ensure that the error no longer occurs.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the Controlling (CO) module for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GP508
The & you have entered does not contain any &
What causes this issue? You have entered a group that already exists. However, this is not a group with &V2&.System Response The system iss...
GP507
Enter a sender cost center or a group
What causes this issue? In activity input planning, you can access planning either with an individual cost center or with a group of cost centers. Ho...
GP510
Changed data has been posted
What causes this issue? ^Your data was entered correctly. This data is available for further evaluation after update.System Response The system issu...
GP511
No detailed planning exists for the combination
What causes this issue? You want to look at the detailed planning for the combination &V1&/&V2& (cost center or order/cost element). ...
Click on this link to search all SAP messages.