Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 104
Message text: Scaling can only be changed for field groups with constant unit
The system displayed records with different units for each line for
field groups with variable units. In order to avoid confusion, which
might occur if a unit is scaled in one way in one line and in a
completely different way in the next line, the scaling option is only
available for field groups with constant units.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GP104
- Scaling can only be changed for field groups with constant unit ?The SAP error message GP104, which states "Scaling can only be changed for field groups with constant unit," typically occurs in the context of working with field groups in SAP, particularly when dealing with data elements that have scaling factors. This error indicates that you are trying to change the scaling of a field group that is not defined with a constant unit, which is a requirement for making such changes.
Cause: Field Group Definition: The field group you are trying to modify may not be defined with a constant unit. In SAP, certain field groups are expected to have a fixed unit of measure, and changing the scaling for these groups is not allowed. Data Element Configuration: The data element associated with the field group may not be configured correctly to support scaling changes. Inconsistent Unit of Measure: If the field group is associated with multiple units of measure or variable units, SAP
Get instant SAP help. Sign up for our Free Essentials Plan.
GP103
You are only planning dimension &
What causes this issue? You have selected the function 'Swap dimension', although you are only planning one variable dimension.System Respo...
GP102
Analog distribution only possible for totals not equal to 0
What causes this issue? You have tried to perform analog distribution with standard distribution key 2, although the total of all period values is eq...
GP105
Ledger & is local
What causes this issue? You can only plan global ledgers in this transaction.System Response The system issues an error message and will not allow y...
GP106
Ledger & is global
What causes this issue? You can only plan local ledgers in this transaction.System Response The system issues an error message and will not allow yo...
Click on this link to search all SAP messages.