Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 106
Message text: Ledger & is global
You can only plan local ledgers in this transaction.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you want to process ledger &V1&, you must select the planning
transactions for global ledgers.
Error message extract from SAP system. Copyright SAP SE.
GP106
- Ledger & is global ?The SAP error message GP106 typically indicates an issue related to the Global Payroll (GP) functionality, specifically concerning the ledger configuration. The error message "GP106 Ledger & is global" suggests that there is a problem with the ledger settings in the Global Payroll module.
Cause: Incorrect Ledger Configuration: The ledger specified in the error message may not be properly configured as a global ledger in the system. Missing or Incomplete Data: There may be missing or incomplete data in the payroll configuration that is required for the global ledger to function correctly. Authorization Issues: The user may not have the necessary authorizations to access or modify the global ledger settings. System Settings: The system may not be set up to recognize the specified ledger as a global ledger.
Solution: Check Ledger Configuration: Navigate to the configuration settings for Global Payroll and verify that the ledger in question is correctly defined as a global ledger. Ensure that all required fields
Get instant SAP help. Sign up for our Free Essentials Plan.
GP105
Ledger & is local
What causes this issue? You can only plan global ledgers in this transaction.System Response The system issues an error message and will not allow y...
GP104
Scaling can only be changed for field groups with constant unit
What causes this issue? The system displayed records with different units for each line for field groups with variable units. In order to avoid conf...
GP107
Company code & is not assigned to ledger &
What causes this issue? You cannot determine the period version, as company code &V1& is not assigned to ledger &V2&.System Response ...
GP108
Global company & is not assigned to ledger &
What causes this issue? You cannot determine the period version as global company &V1& is not assigned to ledger &V2&.System Response...
Click on this link to search all SAP messages.