Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 102
Message text: Analog distribution only possible for totals not equal to 0
You have tried to perform analog distribution with standard
distribution key 2, although the total of all period values is equal to
zero. Due to this, relative factors cannot be determined, so that
analog distribution is not possible.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
&NOTE&
You have probably not planned the record, so that all periods show the
value zero.
Error message extract from SAP system. Copyright SAP SE.
GP102
- Analog distribution only possible for totals not equal to 0 ?The SAP error message GP102, which states "Analog distribution only possible for totals not equal to 0," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with distribution or allocation processes. This error indicates that the system is attempting to perform an analog distribution (a method of distributing costs or revenues based on a reference) where the total amount to be distributed is zero.
Cause:
- Zero Total Amount: The primary cause of this error is that the total amount you are trying to distribute is zero. Analog distribution requires a non-zero total to allocate values proportionally.
- Incorrect Configuration: There may be issues with the configuration of the distribution or allocation process, leading to a situation where the total amounts are not calculated correctly.
- Data Entry Errors: There could be mistakes in the data entry that result in a zero total, such as incorrect cost center assignments or missing values.
Solution:
- Check Totals: Verify the total amount that you are trying to distribute. Ensure that it is not zero. If it is zero, you need to determine why and correct the underlying data.
- Review Allocation Logic: If you are using a specific allocation method, review the logic and parameters used in the allocation to ensure they are set up correctly.
- Adjust Data: If the zero total is due to data entry errors, correct the relevant entries in the system. This may involve adjusting cost center allocations, correcting amounts, or ensuring that all necessary data is included.
- Use Alternative Methods: If analog distribution is not suitable due to the nature of the data, consider using other distribution methods that may be more appropriate for your situation.
Related Information:
By addressing the root cause of the zero total and ensuring that your data and configuration are correct, you should be able to resolve the GP102 error and successfully perform the analog distribution.
Get instant SAP help. Start your 7-day free trial now.
GP101
Set & for & does not contain a valid field from &
What causes this issue? Set &V1& for table &V2& from your planning parameter does not contain a field from table &V3&, to whi...
GP100
********* Messages for planning execution *********************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GP103
You are only planning dimension &
What causes this issue? You have selected the function 'Swap dimension', although you are only planning one variable dimension.System Respo...
GP104
Scaling can only be changed for field groups with constant unit
What causes this issue? The system displayed records with different units for each line for field groups with variable units. In order to avoid conf...