Message type: E = Error
Message class: GM - Combination manager
Message number: 054
Message text: No activity type planning carried out for & in interval &-&
You want to use the sender cost center &V1& and sender activity types
from the interval &V2& - &V3&. However, no activity type planning for
cost center &V1& has been performed for all these activity types in the
fiscal year &V4&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GM054
- No activity type planning carried out for & in interval &-& ?The SAP error message GM054 ("No activity type planning carried out for & in interval &-&") typically occurs in the context of Project System (PS) or Controlling (CO) modules when there is an attempt to perform a transaction that requires activity type planning, but no planning has been done for the specified activity type in the given time interval.
Cause:
- No Planning Data: The primary cause of this error is that there is no activity type planning data available for the specified activity type in the defined period.
- Incorrect Time Interval: The time interval specified in the transaction may not match the planning period for the activity type.
- Missing Configuration: The activity type may not be properly configured in the system, or it may not be assigned to the relevant cost center or internal order.
- Data Entry Error: There may be a mistake in the data entry, such as incorrect activity type or date range.
Solution:
Check Activity Type Planning:
- Go to the planning transaction (e.g., KP06 for cost center planning) and verify if the activity type has been planned for the specified period.
- If not, create the necessary planning data for the activity type in the required time interval.
Review Time Interval:
- Ensure that the time interval you are using in your transaction matches the planning period. If the planning was done for a different period, you may need to adjust your transaction accordingly.
Configuration Check:
- Verify the configuration of the activity type in the system. Ensure that it is correctly assigned to the relevant cost center or internal order.
- Check if the activity type is active and available for planning.
Data Entry Verification:
- Double-check the data you entered in the transaction. Ensure that the activity type and date range are correct.
Consult Documentation:
- If you are unsure about the planning process or configuration, refer to SAP documentation or consult with your SAP support team for guidance.
Related Information:
By following these steps, you should be able to resolve the GM054 error and successfully carry out your intended transaction.
Get instant SAP help. Start your 7-day free trial now.
GM053
Combination &/& is not allocatable in & .
What causes this issue? You want to use the sender cost center/activity type &V1&/&V2&. However, this combination cannot be allocated...
GM052
No activity type planning carried out for &/&
What causes this issue? You want to use the (sender) cost center/activity type &V1&/&V2&. However, no activity type planning has been...
GM055
No activity type planning carried out for &/& in version &
What causes this issue? You want to use sender cost center/activity type &V1&/&V2&. However, no activity type planning has been carri...
GM056
Version & is not permitted for actual postings
What causes this issue? You would like to use the version &V1& in controlling area &V2& for an actual transaction. The 'Record ...
Click on this link to search all SAP messages.