How To Fix GJ601 - Cost Center & Is Invalid for Venture & Equity Group &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GJ - Joint Venture Accounting

  • Message number: 601

  • Message text: Cost Center & Is Invalid for Venture & Equity Group &

  • Show details Hide details
  • What causes this issue?

    The entered cost center is not valid for the current venture and
    equity group.

    System Response

    Processing cannot continue until a valid cost center is entered.

    How to fix this error?

    Verify that the cost center is valid for the current venture and
    equity group combination.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GJ601 - Cost Center & Is Invalid for Venture & Equity Group & ?

    The SAP error message GJ601 indicates that there is an issue with the cost center being used in a transaction related to Venture and Equity Groups. This error typically arises when the cost center is either not valid, not assigned correctly, or not active for the specific context of the transaction.

    Causes:

    1. Invalid Cost Center: The cost center specified in the transaction does not exist in the system.
    2. Inactive Cost Center: The cost center may exist but is not active for the period or context in which you are trying to use it.
    3. Incorrect Assignment: The cost center may not be assigned to the relevant Venture or Equity Group.
    4. Configuration Issues: There may be configuration issues in the controlling area or the organizational structure that prevent the cost center from being used.

    Solutions:

    1. Verify Cost Center:

      • Check if the cost center exists in the system. You can do this by navigating to the cost center master data in SAP (Transaction Code: KS03).
      • Ensure that the cost center is active and valid for the period you are working in.
    2. Check Assignments:

      • Ensure that the cost center is correctly assigned to the relevant Venture and Equity Group. This can be checked in the configuration settings or master data.
    3. Review Configuration:

      • Check the configuration settings in the controlling area to ensure that the cost center is set up correctly for the intended use.
      • Ensure that the cost center is assigned to the correct company code and controlling area.
    4. Consult Documentation:

      • Review any relevant documentation or guidelines provided by your organization regarding the use of cost centers in Venture and Equity transactions.
    5. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or a consultant who specializes in SAP FI/CO for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as KS01 (Create Cost Center), KS02 (Change Cost Center), and KS03 (Display Cost Center).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles: Ensure that you have the necessary authorizations to access and modify cost center data.

    By following these steps, you should be able to identify and resolve the issue related to the GJ601 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker