How To Fix GJ599 - Enter a project.


GJ599 - Overview

  • Message type: E = Error

  • Message class: GJ - Joint Venture Accounting

  • Message number: 599

  • Message text: Enter a project.

  • Show details Hide details
  • What causes this issue?

    System Response

    A valid project must be entered for cash call.

    How to fix this error?

    Enter a valid project or delete the current line.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GJ599 - Enter a project. ?
    The SAP error message GJ599 ("Enter a project") typically occurs in the context of project management or project-related transactions within the SAP system. This error indicates that a required project code or identifier has not been entered in a field where it is mandatory.
    
    Cause: Missing Project Code: The most common cause of this error is that the user has not entered a project code in the relevant field. Field Configuration: The field for the project code may be set as mandatory in the configuration, and if it is left blank, the system will trigger this error. Transaction Context: The error may arise in specific transactions related to project accounting, such as creating or posting costs to a project.
    Solution: Enter a Project Code: The immediate solution is to ensure that you enter a valid project code in the required field. Check if the project code exists in the system. Check Field Settings: If you believe you

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant