Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 219
Message text: Statistical WBS element & is not a valid sender in &
You have specified WBS element &V1& as the sender in &V2&. However,
statistical WBS elements are not a valid sender of periodic allocations
in Overhead Cost Controlling
WBS element &V1& is no longer considered as a sender by the system.
Error message extract from SAP system. Copyright SAP SE.
GA219
- Statistical WBS element & is not a valid sender in & ?The SAP error message GA219 indicates that a statistical Work Breakdown Structure (WBS) element is not recognized as a valid sender in the context of a particular transaction or process. This error typically arises in the context of project accounting or controlling when trying to post costs or revenues to a WBS element that is not set up correctly or is not allowed to be used in the specified context.
Causes of Error GA219
Invalid WBS Element: The WBS element you are trying to use may not be valid for the transaction you are attempting to perform. This can happen if the WBS element is marked as statistical and is not allowed to be used as a sender for certain postings.
WBS Element Status: The WBS element may be in a status that does not allow it to be used for postings. For example, it might be closed or not yet released.
Configuration Issues: There may be configuration settings in the system that restrict the use of statistical WBS elements in certain contexts.
Posting Type: The type of posting you are trying to perform may not be compatible with statistical WBS elements. For example, certain cost allocations or settlements may require a real WBS element.
Solutions to Error GA219
Check WBS Element Validity: Verify that the WBS element you are using is valid for the type of posting you are trying to perform. Ensure that it is not marked as statistical if you need to use it as a sender.
Review WBS Element Status: Check the status of the WBS element in the project structure. Make sure it is released and not in a closed state.
Use a Real WBS Element: If the posting requires a real WBS element, consider using a different WBS element that is not statistical.
Configuration Review: Consult with your SAP configuration team to review the settings related to WBS elements and ensure that they are set up correctly for your business processes.
Transaction Context: Ensure that you are using the correct transaction for the type of posting you are trying to perform. Some transactions may have specific requirements regarding the types of WBS elements that can be used.
Related Information
If the issue persists after checking these aspects, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Project Systems (PS) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GA218
No assignments of cycle run groups to cycles in fiscal year &1
What causes this issue? You are executing a check of the cycle run groups in fiscal year &v1&. However, the system could not find any assignm...
GA217
Receiver rule & is not allowed when entering an allocation structure
What causes this issue? You have selected rule &V1& as the sender rule and entered an allocation structure. This allocation structure can con...
GA220
Statistical WBS element & contains no cost center to be posted to
What causes this issue? You are using statistical WBS element &V1& as a receiver in an assessment, distribution, periodic reposting or indire...
GA221
Incompatible quantities were added together
What causes this issue? For the receiver tracing factor, you have used a rule in which quantities are used. If several records with different units o...
Click on this link to search all SAP messages.