Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 011
Message text: The cycle specified has another Act/Plan indicator
You can define two types of cycles:
Plan cycles
Actual cycles
Different transactions are used to maintain these two cycle types. The
name of the cycle must be different for both cycle types. In this case
the cycle you have selected belongs to the other cycle type.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the name of the cycle or select the correct transaction.
Error message extract from SAP system. Copyright SAP SE.
GA011
- The cycle specified has another Act/Plan indicator ?The SAP error message GA011, which states "The cycle specified has another Act/Plan indicator," typically occurs in the context of SAP's Controlling (CO) module, particularly when dealing with planning and actual data in cycles. This error indicates that there is a mismatch between the indicators used for actual and planned data in the specified cycle.
Cause:
- Cycle Configuration: The cycle you are trying to use has been configured with a different Act/Plan indicator than what you are trying to use. This can happen if the cycle is set up to handle either actual or planned data, but not both.
- Data Entry Error: You may be trying to enter data into a cycle that is not intended for that type of data (e.g., entering actual data into a planning cycle).
- Master Data Issues: There may be inconsistencies in the master data related to the cycle, such as the settings for the controlling area or the planning version.
Solution:
Check Cycle Configuration:
- Go to the cycle configuration in the SAP system (Transaction code: KSV1 for planning cycles or KSV2 for actual cycles).
- Verify the Act/Plan indicator settings for the cycle in question. Ensure that it is set up correctly for the type of data you are trying to enter.
Use the Correct Cycle:
- If you are trying to enter actual data, ensure you are using a cycle designated for actuals. Similarly, if you are entering planned data, use a planning cycle.
Review Master Data:
- Check the master data settings for the controlling area and the planning version to ensure they are consistent with the cycle you are using.
Consult Documentation:
- Review SAP documentation or help resources for specific details on cycle configuration and the implications of the Act/Plan indicator.
Seek Help from SAP Support:
- If the issue persists after checking the configuration and data, consider reaching out to SAP support or your internal SAP team for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the GA011 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
GA010
The cycle specified uses another allocation method
What causes this issue? You can create cycles for the following allocation methods: Periodic transfer Distribution Assessment Process assessment Indi...
GA009
System error: Error while reading Table &
What causes this issue? A major error occurred during READ of Table &V1& for defining the allocation (distribution/assessment).System Respons...
GA012
System error when storing cycle &, start date &.
What causes this issue? An error occurred when table T811C, T811S, T811L, or T811K was saved.System Response The system issues an error message and ...
GA013
Cycle &, starting date & has been saved
What causes this issue? The complete cycle including all groups has been saved.System Response The message "Saved" appears in the top righ...
Click on this link to search all SAP messages.