Message type: E = Error
Message class: G4 - EC-CS Consolidation
Message number: 609
Message text: Cost center &1 in not valid.
Substitution for the Joint Venture document is active. But the cost
center &v1& is not valid for controlling area &v2&.
Original cost center: &v3&
Substituted cost center: &v4&
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please check your entry or the definition of the substitution
Error message extract from SAP system. Copyright SAP SE.
G4609
- Cost center &1 in not valid. ?The SAP error message G4609 ("Cost center &1 is not valid") typically indicates that the cost center you are trying to use in a transaction or report is not recognized by the system. This can happen for several reasons, and here are some common causes, solutions, and related information:
Causes:
- Inactive Cost Center: The cost center may have been marked as inactive or closed in the system.
- Incorrect Cost Center: The cost center code entered may be incorrect or misspelled.
- Cost Center Not Created: The cost center may not have been created in the system.
- Validity Period: The cost center may be valid only for a specific period, and the current date falls outside that range.
- Authorization Issues: The user may not have the necessary authorizations to access the cost center.
- Company Code Issues: The cost center may not be assigned to the company code you are working with.
Solutions:
- Check Cost Center Status: Verify if the cost center is active. You can do this by navigating to the cost center master data in SAP (Transaction code: KS03).
- Verify Cost Center Code: Ensure that the cost center code is entered correctly without any typos.
- Create Cost Center: If the cost center does not exist, you may need to create it (Transaction code: KS01).
- Check Validity Dates: Review the validity dates of the cost center to ensure that it is valid for the current date.
- Authorization Check: Ensure that you have the necessary authorizations to access the cost center. You may need to contact your SAP security team.
- Company Code Assignment: Check if the cost center is assigned to the correct company code. You can do this in the cost center master data.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP's official support channels for further assistance.
Get instant SAP help. Start your 7-day free trial now.
G4608
Ledger &1 has no quantity. Assignment not possible.
What causes this issue? For companies with billing basis 'Cash Based Billing' all assigned quantity.System Response The system issues an e...
G4607
The standard ledger can not be entered as additional ledger.
What causes this issue? The standard ledger are entered in the ledger field for additional ledgerSystem Response The system issues an error message ...
G4610
Order &1 is not valid.
What causes this issue? Substitution for the Joint Venture document is active. But the order &v1& is not valid. Original order: &v2&am...
G4611
Project &1 is not valid.
What causes this issue? Substitution for the Joint Venture document is active. But the project &v1& is not valid. Original project: &v...
Click on this link to search all SAP messages.