Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: G0 - Messages for SAP Consolidation
Message number: 811
Message text: Item &1: no value for subassignment &2 (reqd brkdown, brkdown type 3,4)
Item &V1& is to be carried forward. This item has a required breakdown
by subassignment &V2& with breakdown type 3 or 4. However, the data
record being processed does not have a value for this subassignment.
A possible cause may be that in the old fiscal year there was no
breakdown, or only an optional breakdown, by subassignment &V2& and
therefore there is no value in the subassignment. In this case, it is
not possible to switch to a required breakdown with breakdown type 3 or
4 because the system is unable to determine a value for subassignment
&V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If in the old fiscal year item &V1& had no breakdown, or only an
optional breakdown, by subassignment &V2&, you can proceed as follows:
If there was previously no breakdown, first change the breakdown type
to "optional". Then enter a subassignment value in all data records of
the old fiscal year for item &V1& (for example, in one of the special
periods). Only after doing this, use carrying forward of balances to
switch to a required breakdown with breakdown type 3 or 4.
If there was previously an optional breakdown, first enter a
subassignment value in all data records of the old fiscal year for item
&V1&, in which the subassignment is blank. Only after doing this, use
carrying forward of balances to switch to a required breakdown with
breakdown type 3 or 4.
Error message extract from SAP system. Copyright SAP SE.
G0811
- Item &1: no value for subassignment &2 (reqd brkdown, brkdown type 3,4) ?The SAP error message G0811 indicates that there is a missing value for a subassignment in a financial document or transaction. This error typically arises in the context of cost accounting or internal orders where a breakdown of costs is required, but the necessary data is not provided.
Cause:
The error message G0811 can occur due to several reasons:
- Missing Subassignment Data: The required subassignment (like cost center, internal order, or project) is not filled in the document.
- Incorrect Configuration: The system configuration for the breakdown type (3 or 4) may not be set up correctly, leading to the requirement for subassignment data that is not available.
- Data Entry Errors: Users may have missed entering mandatory fields during the transaction entry.
- Inconsistent Master Data: The master data for the relevant cost objects may not be properly maintained, leading to missing values.
Solution:
To resolve the G0811 error, you can take the following steps:
Check the Document: Review the document or transaction that triggered the error. Ensure that all required fields, especially those related to subassignments, are filled in correctly.
Review Configuration:
- Go to the configuration settings for the relevant module (e.g., Controlling, Financial Accounting) and check the settings for breakdown types 3 and 4.
- Ensure that the system is configured to allow the necessary subassignments for the transaction type you are working with.
Maintain Master Data:
- Verify that all relevant master data (cost centers, internal orders, projects) is correctly maintained and that the necessary values are available.
- If any master data is missing or incorrect, update it accordingly.
Consult Documentation: Refer to SAP documentation or help resources for specific details on the breakdown types and their requirements.
User Training: If the issue is due to data entry errors, consider providing additional training to users on the importance of filling in all required fields.
Debugging: If the issue persists, you may need to involve your SAP technical team to debug the transaction and identify any underlying issues in the code or configuration.
Related Information:
By following these steps, you should be able to identify the cause of the G0811 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
G0810
Unable to perform carrying forward of balances due to euro conversion
What causes this issue? You attempted to carry forward the balances for dimension <ZH>&V1&</> and ledger <ZH>&V2&&l...
G0809
Balance of cons unit &1 not carried forward due to carryforwarding block
What causes this issue? You specified that balances are to be carried forward for consolidation unit <ZH>&V1&</>. However, the &l...
G0812
Item &1: required breakdown (3,4) in subasgmt &2 with fxd value change &3
remark: cf. with message g0 818,819What causes this issue? Item &V1& is to be carried forward. This item has a required breakdown by subassi...
G0813
Item &1 does not exist. Item will not be carried forward
What causes this issue? The dataset to be carried forward does not contain a data record for the item &V1&. This item does not/no longer exis...
Click on this link to search all SAP messages.