How To Fix G0648 - Place the cursor on an activity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: G0 - Messages for SAP Consolidation

  • Message number: 648

  • Message text: Place the cursor on an activity

  • Show details Hide details
  • System Response

    Processing terminated

    How to fix this error?

    To change the sequence of activities, you can move single or multiple
    activities. To move an activity, place the cursor on the activity and
    select it.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message G0648 - Place the cursor on an activity ?

    The SAP error message G0648, which states "Place the cursor on an activity," typically occurs in the context of project management or when working with project structures in SAP, such as in the Project System (PS) module. This error indicates that the system expects the user to select or highlight a specific activity or element before proceeding with an action.

    Cause:

    1. No Selection Made: The user has not selected any activity or project element before attempting to execute a function that requires a specific selection.
    2. Incorrect Navigation: The user may be trying to perform an action that is not applicable at the current level of the project structure or without a valid selection.
    3. User Interface Issue: Sometimes, the user interface may not be responding correctly, leading to confusion about what is selected.

    Solution:

    1. Select an Activity: Ensure that you place the cursor on a valid activity or project element in the project structure. Click on the desired activity to highlight it before executing the action.
    2. Check Project Structure: Make sure you are in the correct project structure view where the activities are displayed. If necessary, navigate to the appropriate section of the project.
    3. Refresh the Screen: If you believe you have selected an activity but still receive the error, try refreshing the screen or reloading the project to ensure the interface is functioning correctly.
    4. Consult Documentation: If you are unsure about the required steps, refer to the SAP documentation or help resources related to the specific transaction or module you are using.

    Related Information:

    • Transaction Codes: This error may occur in various transaction codes related to project management, such as CJ20N (Project Builder) or CJ02 (Change Project).
    • User Permissions: Ensure that you have the necessary permissions to perform actions on the selected activities.
    • SAP Notes: Check for any relevant SAP Notes or updates that may address known issues related to this error message.
    • Training and Support: If you continue to experience issues, consider reaching out to your SAP support team or attending training sessions to better understand the project management functionalities within SAP.

    By following these steps, you should be able to resolve the G0648 error and proceed with your tasks in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant