How To Fix FOPC_UI150 - Tester assignment must be completed before start date of scheduling


FOPC_UI150 - Overview

  • Message type: E = Error

  • Message class: FOPC_UI - Messages from the MIC-UI

  • Message number: 150

  • Message text: Tester assignment must be completed before start date of scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FOPC_UI150 - Tester assignment must be completed before start date of scheduling ?
    The SAP error message FOPC_UI150 indicates that there is an issue with the assignment of a tester in the context of scheduling a process or task. Specifically, it suggests that the assignment of the tester must be completed before the start date of the scheduling process. Here’s a breakdown of the cause, potential solutions, and related information:
    
    Cause: Incomplete Tester Assignment: The tester has not been assigned to the task or process before the scheduled start date. Scheduling Configuration: The scheduling configuration may require that all necessary assignments (like testers) be finalized before the scheduling can proceed. Date Validation: The system is enforcing a rule that prevents scheduling if certain prerequisites (like tester assignments) are not met before the defined start date.
    Solution: Complete Tester Assignment: Navigate to the relevant module in SAP where the tester assignment is managed. Ensure that the tester is assigned to the task or process before the scheduled start date. Save the changes and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker