How To Fix FMEUFCST006 - The new time frame is not within that of the linked operation &1


FMEUFCST006 - Overview

  • Message type: E = Error

  • Message class: FMEUFCST - Customizable Messages for Expenditure Certification

  • Message number: 006

  • Message text: The new time frame is not within that of the linked operation &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FMEUFCST006 - The new time frame is not within that of the linked operation &1 ?
    The SAP error message FMEUFCST006 indicates that there is an issue with the time frame of a forecast or planning operation in relation to a linked operation. Specifically, it means that the new time frame you are trying to set for a forecast does not fall within the time frame of the linked operation (denoted as &1 in the error message).
    
    Cause: Time Frame Mismatch: The new time frame you are trying to assign to the forecast does not overlap with the time frame of the linked operation. This can happen if you are trying to set a forecast for a period that is either too early or too late compared to the linked operation. Incorrect Data Entry: There may be an error in the data entry where the start or end dates of the forecast are incorrectly specified.
    Configuration Issues: There may be configuration settings in the system that restrict the time frames

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author